My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />1. Install preformed sections of same material as straight segments of pipe insulation when <br />available. <br />2. When preformed insulation elbows and fittings are not available, install mitered sections <br />of pipe insulation, to a thickness equal to adjoining pipe insulation. Secure insulation <br />materials with wire or bands. <br />D. Insulation Installation on Valves and Pipe Specialties: <br />1. Install preformed sections of same material as straight segments of pipe insulation when <br />available. <br />2. When preformed sections are not available, install mitered sections of pipe insulation to <br />valve body. <br />3. Arrange insulation to permit access to packing and to allow valve operation without <br />disturbing insulation. <br />4. Install insulation to flanges as specified for flange insulation application. <br />3.8 FINISHES <br />A. Equipment and Pipe Insulation with ASJ, Glass -Cloth, or Other Paintable Jacket Material: Paint <br />jacket with paint system identified below and as specified in Division 09 painting Sections. <br />1. Flat Acrylic Finish: Two finish coats over a primer that is compatible with jacket material <br />and finish coat paint. Add fungicidal agent to render fabric mildew proof. <br />a. Finish Coat Material: Interior, flat, latex -emulsion size. <br />B. Flexible Elastomeric Thermal Insulation: After adhesive has fully cured, apply two coats of <br />insulation manufacturer's recommended protective coating. <br />C. Color: Final color as selected by Architect. Vary first and second coats to allow visual <br />inspection of the completed Work. <br />D. Do not field paint aluminum or stainless-steel jackets. <br />3.9 PIPING INSULATION SCHEDULE, GENERAL <br />A. Acceptable preformed pipe and tubular insulation materials and thicknesses are identified for <br />each piping system and pipe size range. If more than one material is listed for a piping system, <br />selection from materials listed is Contractor's option. <br />3.10 INDOOR PIPING INSULATION SCHEDULE <br />A. Domestic Hot and Recirculated Hot Water: <br />1. Insulation shall be one of the following: <br />a. Mineral -Fiber, Preformed Pipe Insulation, Type I: 1 inch thick. <br />B. Stormwater and Overflow: <br />1. All Pipe Sizes: Insulation shall be one of the following: <br />PLUMBING INSULATION 220700 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.