My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />3.4 TRANSITION FITTING INSTALLATION <br />A. Install transition couplings at joints of dissimilar piping. <br />B. Transition Fittings in Underground Domestic Water Piping: <br />1. Fittings for NPS 1-1/2 and Smaller: Fitting -type coupling. <br />2. Fittings for NPS 2 and Larger: Sleeve -type coupling. <br />C. Transition Fittings in Aboveground Domestic Water Piping NPS 2 and Smaller: Plastic -to -metal <br />transition fittings or unions. <br />3.5 DIELECTRIC FITTING INSTALLATION <br />A. Install dielectric fittings in piping at connections of dissimilar metal piping and tubing. <br />B. Dielectric Fittings for NPS 2 and Smaller: Use dielectric couplings or nipples. <br />C. Dielectric Fittings for NPS 2-1/2 to NPS 4: Use dielectric flanges, flange kits or nipples. <br />3.6 HANGER AND SUPPORT INSTALLATION <br />A. Comply with requirements for pipe hanger, support products, and installation in Section 220529 <br />"Hangers and Supports for Plumbing Piping and Equipment." <br />1. Vertical Piping: MSS Type 8 or 42, clamps. <br />2. Individual, Straight, Horizontal Piping Runs: <br />a. 100 Feet and Less: MSS Type 1, adjustable, steel clevis hangers. <br />b. Longer Than 100 Feet: MSS Type 43, adjustable roller hangers. <br />c. Longer Than 100 Feet if Indicated: MSS Type 49, spring cushion rolls. <br />3. Multiple, Straight, Horizontal Piping Runs 100 Feet or Longer: MSS Type 44, pipe rolls. <br />Support pipe rolls on trapeze. <br />4. Base of Vertical Piping: MSS Type 52, spring hangers. <br />B. Support vertical piping and tubing at base and at each floor. <br />C. Rod diameter may be reduced one size for double -rod hangers, to a minimum of 3/8 inch <br />D. Install hangers for copper tubing with the following maximum horizontal spacing and minimum <br />rod diameters: <br />1. NPS 3/4 and Smaller: 60 inches with 3/8 -inch rod. <br />2. NPS 1 and NPS 1-1/4: 72 inches with 3/8 -inch rod. <br />3. NPS 1-1/2 and NPS 2: 96 inches with 3/8 -inch rod. <br />4. NPS 2-1/2: 108 inches with 1/2 -inch rod. <br />5. NPS 3 to NPS 5: 10 feet with 1/2 -inch rod. <br />E. Install supports for vertical copper tubing every 10 feet <br />F. Support piping and tubing not listed in this article according to MSS SP -69 and manufacturer's <br />written instructions. <br />DOMESTIC WATER PIPING 221116 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.