Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />3.2 CONNECTIONS <br />A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate <br />general arrangement of piping, fittings, and specialties. <br />B. Install piping adjacent to water heaters to allow service and maintenance. Arrange piping for <br />easy removal of water heaters. <br />C. Ground equipment according to Division 26 Section "Grounding and Bonding for Electrical <br />Systems." <br />D. Connect wiring according to Division 26 Section "Low -Voltage Electrical Power Conductors and <br />Cables." <br />3.3 FIELD QUALITY CONTROL <br />A. Manufacturer's Field Service: Engage a factory -authorized service representative to <br />inspect, test, and adjust Feld -assembled components and equipment installation, including <br />connections, and to assist in field testing. Report results in writing. <br />B. Perform the following field tests and inspections and prepare test reports: <br />1. Leak Test: After installation, test for leaks. Repair- leaks and retest until no leaks exist. <br />2. Operational Test: After electrical circuitry has been energized, confirm proper operation. <br />3. Test and adjust controls and safeties. Replace damaged and malfunctioning controls <br />and equipment. <br />C. Remove and replace water heaters that do not pass tests and inspections and retest as <br />specified above. <br />3.4 DEMONSTRATION <br />A. Engage a factory -authorized service representative to train Owner's maintenance personnel to <br />adjust, operate, and maintain commercial electric water heaters. Refer to Division 01 Section <br />"Demonstration and Training." <br />END OF SECTION 223300 <br />ELECTRIC DOMESTIC WATER HEATERS 223300 - 5 <br />