Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />Exception: Omit trap on indirect wastes, unless otherwise indicated. <br />R. Install disposer in outlet of each sink indicated to have disposer. Install switch where indicated <br />or in wall adjacent to sink if location is not indicated. <br />S. Install dishwasher air -gap fitting at each sink indicated to have air -gap fitting. Connect inlet <br />hose to dishwasher and outlet hose to disposer. <br />T. Install escutcheons at piping wall ceiling penetrations in exposed, finished locations and within <br />cabinets and millwork. Use deep -pattern escutcheons if required to conceal protruding fittings. <br />Escutcheons are specified in Division 22 Section "Common Work Results for Plumbing." <br />U. Seal joints between fixtures and walls, floors, and countertops using sanitary -type, one -part, <br />mildew -resistant silicone sealant. Match sealant color to fixture color. Sealants are specified in <br />Division 07 Section "Joint Sealants." <br />3.3 CONNECTIONS <br />A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate <br />general arrangement of piping, fittings, and specialties. <br />B. Connect fixtures with water supplies, stops, and risers, and with traps, soil, waste, and vent <br />piping. Use size fittings required to match fixtures. <br />C. Ground equipment according to Division 26 Section "Grounding and Bonding for Electrical <br />Systems." <br />D. Connect wiring according to Division 26 Section "Low -Voltage Electrical Power Conductors and <br />Cables." <br />3.4 FIELD QUALITY CONTROL <br />A. Verify that installed plumbing fixtures are categories and types specified for locations where <br />installed. <br />B. Check that plumbing fixtures are complete with trim, faucets, fittings, and other specified <br />components. <br />C. Inspect installed plumbing fixtures for damage. Replace damaged fixtures and components. <br />D. Test installed fixtures after water systems are pressurized for proper operation. Replace <br />malfunctioning fixtures and components, then retest. Repeat procedure until units operate <br />properly. <br />E. Install fresh batteries in sensor -operated mechanisms. <br />F. Water Cooler Testing: After electrical circuitry has been energized, test for compliance with <br />requirements. Test and adjust controls and safeties. <br />1. Remove and replace malfunctioning units and retest as specified above. <br />2. Report test results in writing. <br />PLUMBING FIXTURES 224000 - 7 <br />