My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />a. Each product specified <br />2. Quality Assurance/Control Submittals: <br />a. NWFA Technical Reference Manual. <br />b. Proof of bamboo flooring manufacturer's qualifications. <br />c. Test Reports: Reports for specified Physical Property Performance Requirements. <br />3. Shop Drawings: Show installation details including location, layout, fastening method, <br />and transition of each type of flooring and accessory. <br />4. Samples: <br />a. 6 inch (150 mm) long strip of flooring material <br />b. Fasteners <br />c. One of each specified accessory, minimum 4 inches (100 mm) <br />1.05 QUALITY ASSURANCE <br />A. Qualifications <br />1. Manufacturer: <br />a. Minimum 10 years experience in manufacturing and distributing bamboo flooring <br />products. <br />b. Member: National Wood Flooring Association, American Bamboo Society, U.S. <br />Green Building Council. <br />2. Installer: Minimum 5 years experience in hardwood flooring installation. <br />B. Reference Section 01 31 19.33; Pre -Installation Meeting: <br />1. Convene meeting at project site within one week of scheduled start of installation with <br />representatives of the following in attendance: Owner, Architect, General Contractor, <br />Sub -Contractor. <br />2. Review substrate conditions, requirements of related work, requirements for operation of <br />HVAC system, installation instructions, storage and handling procedures, and protection <br />measures. <br />3. Keep minutes of meeting including responsibilities of various parties and deviations from <br />specifications and installation instructions. <br />4. Distribute minutes to attendees within 48 hours. <br />1.06 DELIVERY, STORAGE, AND HANDLING <br />A. Deliver flooring materials in original unopened cartons. <br />B. Reference Section 01 66 00: Product Handling and Storage Requirements. <br />BAMBOO FLOORING 096723-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.