Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />A. Initial Cleaning: Remove temporary coverings and protection of adjacent work areas. When <br />installation has been finished for 24 hours, inspect workmanship and repair or replace damaged <br />installed products. Clean installed products in accordance with manufacturer's instructions <br />prior to Owner's acceptance. Remove construction debris from project site and legally dispose <br />of debris. <br />1. Pick up litter and sweep floor to remove debris using a non -treated dust mop or vacuum <br />cleaner with hard surface attachment. <br />2. Initial Wet Cleaning: Wait at least 48 hours after installation is complete before <br />performing the initial wet cleaning process. This will allow the adhesive to cure. <br />3. Clean new floor thoroughly using a proprietary cleaner/maintainer solution of neutral pH <br />detergent diluted in accordance with manufacturer's instructions. Machine scrub the wet <br />floor using a 3M Red scrubbing pad or equivalent. When finished, remove remaining <br />cleaning solution using a mop or wet vacuum. Rinse floor with clean water and allow to <br />dry thoroughly. <br />4. In conditions of heavy soiling, pre -wash the floor using a proprietary cleaner solution of <br />neutral pH detergent mixed in accordance with manufacturer's instructions. Allow the <br />solution to stand for 5 - 10 minutes before machine scrubbing or in accordance with the <br />manufacturer's instructions. <br />5. For floors requiring the application of a floor fmish, initial cleaning should be carried out <br />using a suitable floor stripper. <br />6. When floor finishes are used, Amtico International recommends at least 2 coats of a satin <br />or low gloss floor finish be applied in accordance with the manufacturer's instructions. <br />Products used should be suitable for the intended usage. <br />7. Routine Maintenance: Frequency of mop or machine cleaning should be determined <br />based upon daily usage and soiling conditions. Perform routine maintenance in <br />accordance with the Amtico International Maintenance Procedures. <br />8. Protection: Protect installed product's fmish surfaces from damage during construction. <br />After the floor has been installed, it should be maintained in a manner that provides a <br />clean and slip resistant surface for occupant safety. <br />3.07 SCHEDULES <br />A. Schedules: Refer to Finish Floor Plan for location of resilient tile flooring. <br />END OF SECTION 096519 <br />RESILIENT TILE FLOORING 096519-10 <br />