My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />A. Initial Cleaning: Remove temporary coverings and protection of adjacent work areas. When <br />installation has been finished for 24 hours, inspect workmanship and repair or replace damaged <br />installed products. Clean installed products in accordance with manufacturer's instructions <br />prior to Owner's acceptance. Remove construction debris from project site and legally dispose <br />of debris. <br />1. Pick up litter and sweep floor to remove debris using a non -treated dust mop or vacuum <br />cleaner with hard surface attachment. <br />2. Initial Wet Cleaning: Wait at least 48 hours after installation is complete before <br />performing the initial wet cleaning process. This will allow the adhesive to cure. <br />3. Clean new floor thoroughly using a proprietary cleaner/maintainer solution of neutral pH <br />detergent diluted in accordance with manufacturer's instructions. Machine scrub the wet <br />floor using a 3M Red scrubbing pad or equivalent. When finished, remove remaining <br />cleaning solution using a mop or wet vacuum. Rinse floor with clean water and allow to <br />dry thoroughly. <br />4. In conditions of heavy soiling, pre -wash the floor using a proprietary cleaner solution of <br />neutral pH detergent mixed in accordance with manufacturer's instructions. Allow the <br />solution to stand for 5 - 10 minutes before machine scrubbing or in accordance with the <br />manufacturer's instructions. <br />5. For floors requiring the application of a floor fmish, initial cleaning should be carried out <br />using a suitable floor stripper. <br />6. When floor finishes are used, Amtico International recommends at least 2 coats of a satin <br />or low gloss floor finish be applied in accordance with the manufacturer's instructions. <br />Products used should be suitable for the intended usage. <br />7. Routine Maintenance: Frequency of mop or machine cleaning should be determined <br />based upon daily usage and soiling conditions. Perform routine maintenance in <br />accordance with the Amtico International Maintenance Procedures. <br />8. Protection: Protect installed product's fmish surfaces from damage during construction. <br />After the floor has been installed, it should be maintained in a manner that provides a <br />clean and slip resistant surface for occupant safety. <br />3.07 SCHEDULES <br />A. Schedules: Refer to Finish Floor Plan for location of resilient tile flooring. <br />END OF SECTION 096519 <br />RESILIENT TILE FLOORING 096519-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.