My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />C. Installation Direction: As shown on Drawings. <br />D. Maintain dye lot integrity. Do not mix dye lots in same area. <br />E. Cut and fit carpet tile to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture <br />including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as <br />recommended by carpet tile manufacturer. <br />F. Extend carpet tile into toe spaces, door reveals, closets, open -bottomed obstructions, removable <br />flanges, alcoves, and similar openings. <br />G. Maintain reference markers, holes, and openings that are in place or marked for future cutting by <br />repeating on finish flooring as marked on subfloor. Use nonpermanent, nonstaining marking <br />device. <br />H. Stagger joints of carpet tiles so carpet tile grid is offset from access flooring panel grid. Do not fill <br />seams of access flooring panels with carpet adhesive; keep seams free of adhesive. <br />3.4 CLEANING AND PROTECTION <br />A. Perform the following operations immediately after installing carpet tile: <br />1. Remove excess adhesive, seam sealer, and other surface blemishes using cleaner <br />recommended by carpet tile manufacturer. <br />2. Remove yarns that protrude from carpet tile surface. <br />3. Vacuum carpet tile using commercial machine with face -beater element. <br />B. Protect installed carpet tile to comply with CRI 104, "Protecting Indoor Installations". <br />C. Protect carpet tile against damage from construction operations and placement of equipment and <br />fixtures during the remainder of construction period. Use protection methods indicated or <br />recommended in writing by carpet tile manufacturer. <br />END OF SECTION 09 6813 <br />TILE CARPETING 096183-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.