My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />1. Amber Edge. <br />B. Baseboard: Prefinished, 5/8" thick by 3" wide by 72" long <br />1. Amber Edge. <br />C. Reducer: Prefinished, 5/8" thick by 2" wide by 72" long <br />1. Amber Edge. <br />D. Standard Threshold: Prefinished, 9/16" thick by 3-5/8" wide by 72" long <br />1. Amber Edge. <br />PART 3 — EXECUTION <br />3.01 EXAMINATION <br />A. Examine substrates for compliance with requirements for installation tolerances, and other <br />conditions affecting performance of flooring. <br />B. Verify substrate is dry, clean and free of loose material, grease, and other contaminates. <br />D. Do not install bamboo flooring if wood substrate exceeds 12% moisture. <br />E. Do no install bamboo flooring if moisture variation between substrate and bamboo exceeds 3%. <br />F. Verify HVAC System is operating and maintaining temperature and humidity conditions in <br />compliance with Manufacturer's Installation Instructions. <br />G. Coordinate with responsible entity to correct unsatisfactory conditions. <br />H. Commencement of work by installer is acceptance of substrate conditions. <br />3.02 PREPARATION <br />A. Humidity: maintain indoor air humidity levels between 30% and 50% for two weeks before <br />installation and continually thereafter. <br />B. Temperature: maintain temperature of materials and installation area between 62 degrees and <br />68 degrees during installation. <br />C. Acclimatization: Open flooring boxes and remove packing minimum 3 days prior to start of <br />installation. <br />D. Grind and fill subfloor using methods and materials appropriate to the subfloor construction to <br />eliminate high spots and depressions exceeding 3/16 inch (5 mm) inch in 10 feet (3048 mm). <br />BAMBOO FLOORING 0962123-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.