My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />E. Painting Mechanical and Electrical Work: Paint items exposed in equipment rooms and <br />occupied spaces including, but not limited to, the following: <br />1. Mechanical Work: <br />a. Uninsulated metal piping. <br />b. Uninsulated plastic piping. <br />c. Pipe hangers and supports. <br />d. Tanks that do not have factory -applied final finishes. <br />e. Visible portions of internal surfaces of metal ducts, without liner, behind air inlets <br />and outlets. <br />f Duct, equipment, and pipe insulation having cotton or canvas insulation covering <br />or other paintable jacket material. <br />g. Ductwork both insulated and uninsulated and mechanical equipment that is <br />exposed to view in normally occupied spaces. <br />h. Mechanical equipment that is indicated to have a factory -primed finish for field <br />painting. <br />2. Electrical Work: <br />a. Switchgear. <br />b. Panelboards. <br />c. Electrical equipment that is indicated to have a factory -primed finish for field <br />painting. <br />3.4 CLEANING AND PROTECTION <br />At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from <br />Project site. <br />B. After completing paint application, clean spattered surfaces. Remove spattered paints by <br />washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces. <br />C. Protect work of other trades against damage from paint application. Correct damage to work of <br />other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and <br />leave in an undamaged condition. <br />D. At completion of construction activities of other trades, touch up and restore damaged or <br />defaced painted surfaces. <br />3.5 INTERIOR PAINTING SCHEDULE <br />A. Concrete Substrates, Non -traffic Surfaces: <br />1. Latex System: MPI INT 3.1E. <br />a. Prime Coat. Interior latex matching topcoat. <br />b. Intermediate Coat: Interior latex matching topcoat. <br />c. Topcoat: Interior latex (low sheen). <br />INTERIOR PAINTING 09 91 23 - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.