Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />SECTION 09 60 00 - HIGH PERFORMANCE COATING <br />PART 1 -GENERAL <br />1.1 GENERAL REQUIREMENTS <br />A. Work of this Section as shown or specified shall be in accordance with the requirements of the <br />Contract Documents. <br />1.2 WORK INCLUDED <br />A. Work of this Section includes all labor, materials, equipment and services necessary to <br />complete epoxy flooring incorporating ceramic coated colored inorganic quartz aggregate and <br />integral base as selected on drawings and/or specified herein. <br />1.3 RELATED WORK <br />A. Concrete - Section 03300 <br />(Note to specifier: Concrete should be either water cured or cured using sodium silicate curing <br />compounds only. Other types of curing compounds are generally not acceptable. Concrete <br />should be cured for a minimum of 28 days. On grade floors should have functioning vapor <br />retarder beneath slab.) <br />B. Floor drains - Division 15 <br />(Note to Specifier: Floor drains, clean -outs etc. should be of the floor -flange type <br />manufactured for use with composition floors by most major drain manufacturers.) <br />1.4 SUBMITTALS <br />A. General: Submit the following in accordance with Conditions of Contract and Division 1 <br />Specification Sections. <br />B. Product Data: Submit manufacturer's technical data application instructions and general <br />recommendations for decorative quartz epoxy flooring specified herein. <br />C. LEED Submittals: <br />1. Product Data for Credit MR 4.1 and Credit MR 4.2: For products having recycled <br />content, submit documentation indicating percentages by weight of postconsumer and <br />preconsumer recycled content. <br />a. Include statement indicating costs for each product having recycled content. <br />b. Include LEED Product Information Form for LEED Credits MR 4.1 and 4.2. <br />HIGH PERFORMANCE COATING 099600-1 <br />