Laserfiche WebLink
Document A310 TM - 2010 <br />Conforms with The American Institute of Architects AIA Document 310 <br />Bid Bond <br />CONTRACTOR: SURETY: <br />(Mame, legal status and address) (Mane, legal stains and principal place C f hzcriness) <br />Travelers Casualty and Surety Company of America <br />Kast Construction Company, LLC <br />701 Northpoint Parkway, Suite 400 <br />West Palm Beach, FL 33407 <br />One Tower Square <br />Hartford, CT 06183 <br />OWNER: <br />(Main, legal status and address) <br />Indian River County Board of County Commissioners <br />1800 27th St. <br />Vero Beach, FL 32960 <br />BOND AMOUNT: $ 5% <br />Five Percent of Amount Bid <br />This document has important <br />legal consequences. Consultation <br />with an attorney is encouraged <br />with respect to its completion or <br />modification. <br />Any singular reference to <br />Contractor, Surety, Owner or <br />other party shall be considered <br />plural where applicable. <br />PROJECT: <br />(,'Farre, location or address andProjectlumber, ifant) <br />Project No. 1135 Intergenerational Recreation Facility at South County Regional Park <br />The Contractor and Surety arc bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind <br />themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this <br />Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period <br />as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with <br />the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in <br />the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt <br />payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of <br />this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another <br />party to perform the work covered by said hid, then this obligation shall be null and void, otherwise to remain in lull force and effect. The <br />Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the <br />bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond tite time lbr <br />acceptance of bids specified in the hid documents,, and the Owner and Contractor shall obtain the Surety's consent lbr an extension beyond <br />sixty (60) days. <br />If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be <br />Subcontractor and the term Owner shall be deemed to be Contractor. <br />When this Bond has been furnished to comply with a statutory or other legal requirement in the location or the Project any provision in <br />this Bond conflicting with said statutory or legal requirement shall be deemed deleted herelront and provisions conlonning to such <br />statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond : hall be construed <br />as a statutory bond and not as a common law bond. <br />Signed and seated this 22nd day of October, 2014 <br />(Witness) Je i r Stephens <br />Kast Construction Company, LLC <br />(Principal) <br />By: <br />Mao U <br />i./62 , . re <br />(Seal) <br />Travelers Casualty and Surety Company of America <br />(Surety) (Seal) <br />By: l J�-- <br />(Titie)Kevin Wojtowicz Attorney -in -Fact <br />S-0054/AS 8/10 <br />