Laserfiche WebLink
7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br /> conditions and drawings of physical conditions which are identified in the Supplementary <br /> Conditions as provided in Paragraph 4.02 of the General Conditions, and accepts the <br /> determination set forth in Paragraph SC-4.02 of the Supplementary Conditions of the extent of <br /> the technical data contained in such reports and drawings upon which CONTRACTOR is <br /> entitled to rely. <br /> 7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining <br /> and carefully studying) all such examinations, investigations, explorations, tests, reports and <br /> studies (in addition to or to supplement those referred to in Paragraph 7.2 above)which pertain <br /> to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the <br /> cost, progress, performance or furnishing of the work as CONTRACTOR considers necessary <br /> for the performance of furnishing of the work at the Contract Price, within the Contract Time <br /> and in accordance with the other terms and conditions of the Contract Documents, including <br /> specifically the provisions of Paragraph 4.02 of the General Conditions; and no additional <br /> examinations, investigations, explorations, tests, reports, studies or similar information or data <br /> are or will be required by CONTRACTOR for such purposes. <br /> 7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the <br /> Contract Documents with respect to existing underground facilities at or contiguous to the site <br /> and assumes responsibility for the accurate location of said underground facilities. No <br /> additional examinations, investigations, explorations, tests, reports, studies or similar <br /> information or data in respect of said underground facilities are or will be required by <br /> CONTRACTOR in order to perform and furnish the work at the Contract Price, within the <br /> Contract Time and in accordance with the other terms and conditions of the Contract <br /> Documents, including specifically the provisions of Paragraph 4.04 of the General Conditions. <br /> 7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br /> investigations, explorations, tests, reports and studies with the terms and conditions of the <br /> Contract Documents. <br /> 7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies <br /> that he has discovered in the Contract Documents and the written resolution thereof by <br /> ENGINEER is acceptable to CONTRACTOR. <br /> ARTICLE 8 CONTRACT DOCUMENTS. <br /> The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR <br /> concerning the work consist of the following: <br /> 8.1 This Agreement (Section 00530). <br /> 8.2 Public Construction Bond (Section 00610). <br /> 8.3 Notice of Award and Notice to Proceed (examples in Section 00800). <br /> 8.4 General Conditions (Section 00700). <br /> 8.5 Supplementary Conditions (Section 00800). <br /> 8.6 Specifications bearing the title "SHELL LANE EAST A PORTION OF SUMMERPLACE <br /> PETITION ASSESSMENT 8" GRAVITY SEWER PROJECT / Proiect No. UCP 4039 / Bid <br /> No. 2010023" as listed in the table of contents hereof. <br /> 8.7 Drawings, inclusive with each sheet bearing the following general title "SHELL LANE EAST A <br /> PORTION OF SUMMERPLACE PETITION ASSESSMENT 8" GRAVITY SEWER <br /> PROJECT UCP No. 4039 Indian River County Department of UtilitV Services" <br /> 00530-5 <br />