My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-059
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 8:04:42 PM
Creation date
10/5/2015 8:55:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/02/2010
Control Number
2010-059
Agenda Item Number
12.J.2
Entity Name
R.K. Contractors
Subject
Summerplace Petition Water Assessment Project 12.J.2.
Shell Lane East Agreement
Area
Summerplace, Shell Lane
Supplemental fields
SmeadsoftID
8221
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br /> conditions and drawings of physical conditions which are identified in the Supplementary <br /> Conditions as provided in Paragraph 4.02 of the General Conditions, and accepts the <br /> determination set forth in Paragraph SC-4.02 of the Supplementary Conditions of the extent of <br /> the technical data contained in such reports and drawings upon which CONTRACTOR is <br /> entitled to rely. <br /> 7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining <br /> and carefully studying) all such examinations, investigations, explorations, tests, reports and <br /> studies (in addition to or to supplement those referred to in Paragraph 7.2 above)which pertain <br /> to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the <br /> cost, progress, performance or furnishing of the work as CONTRACTOR considers necessary <br /> for the performance of furnishing of the work at the Contract Price, within the Contract Time <br /> and in accordance with the other terms and conditions of the Contract Documents, including <br /> specifically the provisions of Paragraph 4.02 of the General Conditions; and no additional <br /> examinations, investigations, explorations, tests, reports, studies or similar information or data <br /> are or will be required by CONTRACTOR for such purposes. <br /> 7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the <br /> Contract Documents with respect to existing underground facilities at or contiguous to the site <br /> and assumes responsibility for the accurate location of said underground facilities. No <br /> additional examinations, investigations, explorations, tests, reports, studies or similar <br /> information or data in respect of said underground facilities are or will be required by <br /> CONTRACTOR in order to perform and furnish the work at the Contract Price, within the <br /> Contract Time and in accordance with the other terms and conditions of the Contract <br /> Documents, including specifically the provisions of Paragraph 4.04 of the General Conditions. <br /> 7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br /> investigations, explorations, tests, reports and studies with the terms and conditions of the <br /> Contract Documents. <br /> 7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies <br /> that he has discovered in the Contract Documents and the written resolution thereof by <br /> ENGINEER is acceptable to CONTRACTOR. <br /> ARTICLE 8 CONTRACT DOCUMENTS. <br /> The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR <br /> concerning the work consist of the following: <br /> 8.1 This Agreement (Section 00530). <br /> 8.2 Public Construction Bond (Section 00610). <br /> 8.3 Notice of Award and Notice to Proceed (examples in Section 00800). <br /> 8.4 General Conditions (Section 00700). <br /> 8.5 Supplementary Conditions (Section 00800). <br /> 8.6 Specifications bearing the title "SHELL LANE EAST A PORTION OF SUMMERPLACE <br /> PETITION ASSESSMENT 8" GRAVITY SEWER PROJECT / Proiect No. UCP 4039 / Bid <br /> No. 2010023" as listed in the table of contents hereof. <br /> 8.7 Drawings, inclusive with each sheet bearing the following general title "SHELL LANE EAST A <br /> PORTION OF SUMMERPLACE PETITION ASSESSMENT 8" GRAVITY SEWER <br /> PROJECT UCP No. 4039 Indian River County Department of UtilitV Services" <br /> 00530-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.