2. Substitute Items directly or indirectly from use of such <br />substitute item, including costs of redesign <br />a. If in ENGINEER's sole discretion an and claims of other contractors affected by <br />item of material or equipment proposed by any resulting change, all of which will be <br />CONTRACTOR does not qualify as an considered by ENGINEER in evaluating the <br />"or -equal" item under paragraph 6.05.A.1, it proposed substitute item. ENGINEER may <br />will be considered a proposed substitute require CONTRACTOR to furnish additional <br />item. data about the proposed substitute item. <br />b. CONTRACTOR shall submit suffi- <br />B. Substitute Construction Methods or Proce- <br />cierit information as provided below to allow <br />dures: If a specific means, method, technique, se - <br />ENGINEER to determine that the item of <br />quence, or procedure of construction is shown or <br />material or equipment proposed is <br />indicated in and expressly required by the Contract <br />essentially equivalent to that named and an <br />Documents, CONTRACTOR may furnish or utilize a <br />acceptable substitute therefor. Requests for <br />substitute means, method, technique, sequence, or <br />review of proposed substitute items of <br />procedure of construction approved by ENGINEER. <br />material or equipment will not be accepted <br />CONTRACTOR shall submit sufficient information to <br />by ENGINEER from anyone other than <br />allow ENGINEER, in ENGINEER's sole discretion, to <br />CONTRACTOR. <br />determine that the substitute proposed is equivalent to <br />that expressly called for by the Contract Documents. <br />c. The procedure for review by ENGI- <br />The procedure for review by ENGINEER will be similar <br />NEER will be as set forth in paragraph <br />to that provided in subparagraph 6.05.A.2. <br />6.05.A.2.d, as supplemented in the General <br />Requirements and as ENGINEER may <br />C. Engineer's Evaluation: ENGINEER will be <br />decide is appropriate under the <br />allowed a reasonable time within which to evaluate <br />circumstances. <br />each proposal or submittal made pursuant to para- <br />graphs 6.05.A and 6.05.13. ENGINEER will be the <br />d. CONTRACTOR shall first make <br />sole judge of acceptability. No "or -equal" or substitute <br />written application to ENGINEER for review <br />will be ordered, installed or utilized until ENGINEER's <br />of a proposed substitute item of material or <br />review is complete, which will be evidenced by either a <br />equipment that CONTRACTOR seeks to <br />Change Order for a substitute or an approved Shop <br />furnish or use. The application shall certify <br />Drawing for an "or equal." ENGINEER will advise <br />that the proposed substitute item will <br />CONTRACTOR in writing of any negative <br />perform adequately the functions and <br />determination. <br />achieve the results called for by the general <br />design, be similar in substance to that <br />D. Special Guarantee: OWNER may require <br />specked, and be suited to the same use as <br />CONTRACTOR to furnish at CONTRACTOR's ex - <br />that specified. The application will state the <br />pense a special performance guarantee or other <br />extent, if any, to which the use of the pro- <br />surety with respect to any substitute. <br />posed substitute item will prejudice <br />CONTRACTOR's achievement of Substan- <br />E. ENGINEER's Cost Reimbursement: <br />tial Completion on time, whether or not use <br />ENGINEER will record time required by ENGINEER <br />of the proposed substitute item in the Work <br />and ENGINEER's Consultants in evaluating substitute <br />will require a change in any of the Contract <br />proposed or submitted by CONTRACTOR pursuant to <br />Documents (or in the provisions of any other <br />paragraphs 6.05.A.2 and 6.05.13 and in making <br />direct contract with OWNER for work on the <br />changes in the Contract Documents (or in the <br />Project) to adapt the design to the proposed <br />provisions of any other direct contract with OWNER <br />substitute item and whether or not <br />for work on the Project) occasioned thereby. Whether <br />incorporation or use of the proposed substi- <br />or not ENGINEER approves a substitute item so pro- <br />tute item in connection with the Work is sub- <br />posed or submitted by CONTRACTOR, CON- <br />ject to payment of any license fee or royalty. <br />TRACTOR shall reimburse OWNER for the charges <br />All variations of the proposed substitute <br />of ENGINEER and ENGINEER's Consultants for <br />item from that specified will be identified in <br />evaluating each such proposed substitute. <br />the application, and available engineering, <br />sales, maintenance, repair, and <br />F. CONTRACTOR's Expense: CONTRACTOR <br />replacement services will be indicated. The <br />shall provide all data in support of any proposed <br />application will also contain an itemized esti- <br />substitute or "or -equal" at CONTRACTOR's expense. <br />mate of all costs or credits that will result <br />00700 - General Conditions REV 04-07 <br />00700-20 <br />F:\Engineering\Capital Projects\0455 8th St SIDEWALK FROM lath COURT TO OLD DIXIE\0455 CONTRACT DOCS & SPECS\00700 - General Conditions REV 04-07.doc <br />