My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-139
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:58:27 PM
Creation date
10/5/2015 9:01:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR, indicating in writing the <br />reasons for refusing to recommend final <br />payment, in which case CONTRACTOR shall <br />make the necessary corrections and resubmit <br />the Application for Payment. <br />C. Payment Becomes Due <br />14.08 Final Completion Delayed <br />A. If, through no fault of CONTRACTOR, final <br />completion of the Work is significantly delayed, and if <br />ENGINEER so confirms, OWNER shall, upon receipt <br />of CONTRACTOR's final Application for Payment and <br />recommendation of ENGINEER, and without terminat- <br />ing the Agreement, make payment of the balance due <br />for that portion of the Work fully completed and <br />accepted. If the remaining balance to be held by <br />OWNER for Work not fully completed or corrected is <br />less than the retainage stipulated in the Agreement, <br />and if Bonds have been furnished as required in <br />paragraph 5.01, the written consent of the surety to <br />the payment of the balance due for that portion of the <br />Work fully completed and accepted shall be submitted <br />by CONTRACTOR to ENGINEER with the Application <br />for such payment. Such payment shall be made <br />under the terms and conditions governing final <br />payment, except that it shall not constitute a waiver of <br />Claims. <br />14.09 Waiver of Claims <br />A. The making and acceptance of final payment <br />will constitute: <br />1. a waiver of all Claims by OWNER <br />against CONTRACTOR, except Claims arising <br />from unsettled Liens, from defective Work <br />appearing after final inspection pursuant to <br />paragraph 14.06, from failure to comply with the <br />Contract Documents or the terms of any special <br />guarantees specified therein, or from <br />CONTRACTOR's continuing obligations under <br />the Contract Documents; and <br />2. a waiver of all Claims by CONTRAC- <br />TOR against OWNER other than those <br />previously made in writing which are still <br />unsettled. <br />ARTICLE 15 - SUSPENSION OF WORK AND <br />TERMINATION <br />15.01 OWNER May Suspend Work <br />A. At any time and without cause, OWNER may <br />suspend the Work or any portion thereof for a period <br />of not more than 90 consecutive days by notice in <br />writing to CONTRACTOR and ENGINEER which will <br />fix the date on which Work will be resumed. CON- <br />TRACTOR shall resume the Work on the date so <br />fixed. <br />as provided iR paragraph 40.0-5. <br />15.02 OWNER May Terminate for Cause <br />A. The occurrence of any one or more of the <br />following events will justify termination for cause: <br />1. CONTRACTOR's persistent failure <br />to perform the Work in accordance with the <br />Contract Documents (including, but not limited <br />to, failure to supply sufficient skilled workers or <br />suitable materials or equipment or failure to <br />adhere to the progress schedule established <br />under paragraph 2.07 as adjusted from time to <br />time pursuant to paragraph 6.04); <br />2. CONTRACTOR's disregard of Laws <br />or Regulations of any public body having <br />jurisdiction; <br />3. CONTRACTOR's disregard of the <br />authority of ENGINEER; or <br />4. CONTRACTOR's violation in any <br />substantial way of any provisions of the <br />Contract Documents. <br />B. If one or more of the events identified in <br />paragraph 15.02A occur, OWNER may, after giving <br />CONTRACTOR (and the surety, if any) seven days <br />written notice, terminate the services of <br />CONTRACTOR, exclude CONTRACTOR from the <br />Site, and take possession of the Work and of all <br />CONTRACTOR's tools, appliances, construction <br />equipment, and machinery at the Site, and use the <br />same to the full extent they could be used by <br />CONTRACTOR (without liability to CONTRACTOR for <br />trespass or conversion), incorporate in the Work all <br />materials and equipment stored at the Site or for <br />which OWNER has paid CONTRACTOR but which <br />are stored elsewhere, and finish the Work as OWNER <br />may deem expedient. In such case, CONTRACTOR <br />00700 - General Conditions REV 04-07.doc <br />00700-42 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\0455-8th Street Sidewalk Improvements 18th Ct to Old Dixie\Ndmim\bid documents\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.