Laserfiche WebLink
SECTION 00948 - Work Change Directive <br />EFFECTIVE DATE: <br />DATE OF ISSUANCE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: 8th Street Sidewalk from 18th Court to Old Dixie Hwy. <br />Bid No. 2010019 ENGINEER's Contract No. 0455 <br />ENGINEER: Indian River County <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices: <br />[j Unit Prices <br />❑ Lump Sum <br />II Other: <br />II By Change Order: <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />II Engineer's Records <br />II Other: <br />II By Change Order: <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />RECOMMENDED: <br />By: <br />ENGINEER (Authorized Signature) <br />Date: <br />AUTHORIZED: <br />By: <br />OWNER (Authorized Signature <br />Date: <br />* * END OF SECTION * * <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\0455-8th Street Sidewalk Improvements 18th Ct to Old DixieWdmim\bid <br />documents\00948 - Work Change Directive.doc <br />