Laserfiche WebLink
SECTION 01024 <br />FORCE ACCOUNT <br />1.1 General <br />CONTRACTOR shall furnish all labor, materials, equipment and incidentals <br />necessary to perform additional work not covered on the Contract Drawings. <br />The force Account is intended as a contingency for unforeseen work. <br />1_1 PAYMENT <br />A. Lump sum amount for force account work is included in the bid schedule. <br />The value of force account work will be determined in accordance with Article <br />12 of the General Conditions. <br />+ + END OF SECTION + + <br />01024-1 <br />F:\Engineering\Capital Projects\0455 8th St SIDEWALK FROM 18th COURT TO OLD DIXIE\0455 CONTRACT DOCS & <br />SPECS\01024 - Force Account.doc <br />