My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-139
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:58:27 PM
Creation date
10/5/2015 9:01:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br />A. After receiving approval by the ENGINEER, distribute copies of the <br />approved initial schedule and all reviewed revisions (updated) to: <br />1. Job site file. <br />2. Subcontractors. <br />3. Other concerned parties. <br />4. OWNER (two copies). <br />5. ENGINEER <br />B. In the cover letter, instruct recipients to report promptly to the <br />CONTRACTOR, in writing, any problems anticipated by the projections <br />shown in the schedules. <br />+ + END OF SECTION + + <br />01310-2 01310 Construction Schedule <br />F:\Engineering\Capital Projects\0455 8th St SIDEWALK FROM 18th COURT TO OLD DIXIE\0455 CONTRACT DOCS & <br />SPECS\01310 - Construction Schedule.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.