My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-139
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:58:27 PM
Creation date
10/5/2015 9:01:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. If the substitution requires a more extensive review, Engineer will <br />proceed with the review only after CONTRACTOR has agreed to <br />reimburse Owner for the review cost. <br />5. Engineer may require CONTRACTOR to furnish at CONTRACTOR's <br />expense additional data about the proposed substitute. <br />H. Any redesign of structural members shall be performed by, and the plans signed <br />and sealed by, a Professional Engineer registered in the State of Florida. The <br />redesign shall be at the CONTRACTOR's expense. Any redesign will require an <br />extensive review by the Engineer. The CONTRACTOR must agree to reimburse <br />the Owner for the review cost prior to the Owner's Engineer proceeding with the <br />design review. The ENGINEER's hourly rate for review is $128 per hour. The <br />ENGINEER's estimated cost of review shall be provided to the CONTRACTOR <br />prior to proceeding with the review to allow the CONTRACTOR the opportunity to <br />rescind the request. <br />Engineer will be allowed a reasonable time within which to evaluate each <br />proposed substitution. Engineer will be the sole judge of acceptability and shall <br />have the right to deny use of any proposed substitution. The CONTRACTOR <br />shall not order, install, or utilize any substitution without either an executed <br />Change Order or Engineer's notation on the reviewed shop drawing. Owner may <br />require CONTRACTOR to furnish at CONTRACTOR's expense a special <br />manufacturer's performance guarantee(s) or other surety with respect to any <br />substitute and an indemnification by the CONTRACTOR. ENGINEER will record <br />time required by Engineer and Engineer's consultants in evaluating substitutions <br />proposed by CONTRACTOR and in making changes in the Contract Documents <br />occasioned thereby. Whether or not a proposed substitute is sued, <br />CONTRACTOR shall reimburse Owner for the charges of Engineer and <br />Engineer's consultants for evaluating each proposed substitute. <br />J. Substitute materials or equipment may be proposed for acceptance in <br />accordance with this Section. In the event that substitute materials or equipment <br />are used and are less costly than the originally specified material or equipment, <br />than the net difference in cost shall benefit the Owner and CONTRACTOR in <br />equal proportions. This cost difference shall not be reduced by any failure of the <br />CONTRACTOR to base his bid on the named materials or equipment. <br />+ + END OF SECTION + + <br />01630-3 01630 Substitutions <br />F:\Engineering\Capital Projects\0455 8th St SIDEWALK FROM 18th COURT TO OLD DIXIE\0455 CONTRACT DOCS & SPECS\01630 - <br />Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.