Laserfiche WebLink
SECTION 01820 <br />Post Final Inspection <br />1.1 GENERAL <br />A. Approximately one year after Substantial Completion, the OWNER will make <br />arrangements with the Construction Coordination Manager and the <br />CONTRACTOR for a post final inspection and will send a written notice to said <br />parties to inform them of the date and time of the inspection. <br />B. Corrections of defective work noted by OWNER and Construction Coordination <br />Manager shall comply with the applicable sections of Article 13, General <br />Conditions. <br />C. After the inspection, the OWNER will inform the CONTRACTOR of any <br />corrections required to release the performance and payment bonds. <br />01820 Post Final Inspection <br />01820-1 <br />F:\Engineering\Capital Projects\0455 8th St SIDEWALK FROM 18th COURT TO OLD DIXIE\0455 CONTRACT DOCS & SPECS\01820 - Post Final <br />Inspection.doc <br />