Laserfiche WebLink
H. Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed Limerock: Crushed limerock shall not be used under any <br />circumstance. <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate (usually granite), <br />washed and meeting the requirements of FDOT Standard Specifications for <br />Road and Bridge Construction, Section 901. <br />I. Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site and <br />from all other areas disturbed by construction activities. <br />B. Apply polyacrylamide only as directed by the polyacrylamide manufacturer/supplier. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-1 — Erosion & Water Pollution Control - Lump Sum <br />[The remainder of this page was left blank intentionally] <br />01025-10 Technical Specifications <br />C•1D..MIin \A/nrl.c\CAIf_IAICCDIAI!_ nl\/�ClrlAl DDrl 1=f TQ%nARq_Rfh Qfm f Q1A.a el4 Imnmvomonfc 1Rih (1%f^ rVA f Aa%Arimim\hiri <br />