My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-139
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:58:27 PM
Creation date
10/5/2015 9:01:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120-8.3.2.1 Lowest Zone: Backfill areas undercut below the Bedding <br />Zone of a pipe with coarse sand, or other suitable granular material, obtained from the <br />grading operations on the project, or a commercial material if no suitable material is available. <br />120-8.3.2.2 Soil Envelope: In both the Bedding Zone and the Cover <br />Zone of the pipe, backfill with materials classified as A-1, A-2, or A-3. Material classified as A- <br />4 may be used if the pipe is concrete pipe. <br />120-8.3.2.3 Top Zone: Backfill the area of the trench above the soil <br />envelope of the pipe with materials allowed on Design Standard, Index No. 505. <br />120-8.3.3 Compaction: <br />120-8.3.3.1 Lowest Zone: Compact the soil in the Lowest Zone to <br />approximately match the density of the soil in which the trench was cut. <br />120-8.3.3.2 Bedding Zone: If the trench was not undercut below the <br />bottom of the pipe, loosen the soil in the bottom of the trench immediately below the <br />approximate middle third of the outside diameter of the pipe. <br />If the trench was undercut, place the bedding material and leave it <br />in a loose condition below the middle third of the outside diameter of the pipe. Compact the <br />outer portions to meet the density requirements of the Acceptance Criteria. Place the material <br />in lifts no greater than 6 inches (compacted thickness). <br />120-8.3.3.3 Cover Zone: Place the material in 6 inches layers <br />(compacted thickness), evenly deposited on both sides of the pipe, and compact with <br />mechanical tampers suitable for this purpose. Hand tamp material below the pipe haunch that <br />cannot be reached by mechanical tampers. Meet the requirements of the density Acceptance <br />Criteria. <br />120-8.3.3.4 Top Zone: Place the material in layers not to exceed <br />12 inches in compacted thickness. Meet the requirements of the density Acceptance Criteria. <br />120-8.3.4 Backfill Under Wet Conditions: Where wet conditions are such that <br />dewatering by normal pumping methods would not be effective, the procedure outlined below <br />may be used when specifically authorized by the Engineer in writing. <br />Granular material may be used below the elevation at which mechanical <br />tampers would be effective, but only material classified as A-3. Place and compact the <br />material using timbers or hand tampers until the backfill reaches an elevation such that it's <br />moisture content will permit the use of mechanical tampers. When the backfill has reached <br />such elevation, use normally acceptable backfill material. Compact the material using <br />mechanical tampers in such manner and to such extent as to transfer the compacting force <br />into the material previously tamped by hand. <br />120-9 Acceptance Program. <br />120-9.1 Density over 105%: When a computed dry density results in a value greater <br />than 105% of the applicable Proctor maximum dry density, perform a second density test <br />within 5 feet. If the second density results in a value greater than 105%, investigate the <br />compaction methods, examine the applicable Maximum Density and material description. If <br />necessary, test an additional sample for acceptance in accordance with AASHTO T 99, <br />Method C. <br />120-9.2 Maximum Density Determination: Determine the maximum density and <br />optimum moisture content by sampling and testing the material in accordance with the <br />specified test method listed in 120-9.3. <br />120-9.3 Density Testing Requirements: Ensure compliance with the requirements of <br />120-9.5 by Nuclear Density testing in accordance with FDOT Florida Method FM 1-T 238. <br />01025-29 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\0455-8th Street Sidewalk Improvements 18th Ct to Old DixieWdmim\bid <br />documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.