Laserfiche WebLink
344-3 Production, Mixing and Delivery of Concrete. <br />344-3.1 Concrete Production Requirements: Use concrete production facilities <br />certified by the National Ready -Mixed Concrete Association (NRMCA), approved by the <br />FDOT. <br />Produce concrete utilizing equipment that is in good operating condition and <br />operated in a manner to ensure a consistent product. When moisture probes are not used, <br />ensure that the concrete production facility determines the free moisture for the coarse and <br />fine aggregates within two hours prior to each day's batching. On concrete placements <br />expected to exceed three hours, perform an additional moisture test approximately half way <br />through the batching operations and adjust batch proportions accordingly. <br />Ensure that the calibration of the measuring devices of the concrete production <br />facilities meets the requirements of Chapter 531 of the Florida Statutes, and are in <br />accordance with Chapter 9.2 of the FDOT Materials Manual. At least quarterly, ensure that all <br />scales, meters and other weighing or measuring devices are checked for accuracy by a <br />qualified representative of a scale company registered with the Bureau of Weights and <br />Measures of the Florida Department of Agriculture. As an alternative, the producer may have <br />this frequency identified in an FDOT approved QC plan. The accuracy of admixture <br />measuring dispensers will be certified annually by the admixture supplier. <br />When Volumetric Mixers are used for Category I applications, deliver concrete in <br />accordance with the requirements of Volumetric Mixer Manufacturers Bureau (VMMB) and <br />ensure that the vehicle has a VMMB registered rating plate. <br />344-3.2 Classes of Concrete: Classes of concrete to be used on the project will be <br />defined in the Contract Documents. <br />344-3.3 Contractors Quality Control: The Contractor will supply a Quality Control <br />(QC) plan to identity to the Agency how quality will be ensured at the project site. During <br />random inspections the Agency will use this document to verify that the construction of the <br />project is in agreement with his QC plan. <br />344-3.4 Concrete Mix Design: Before producing any concrete, submit the proposed <br />mix design to the Engineer on a form provided by the Agency. Otherwise, the agency will <br />accept mix designs previously described in an FDOT approved QC plan. In any event, use <br />only concrete mix designs having prior approval of the Engineer. <br />Materials may be adjusted provided that the theoretical yield requirement of the <br />approved mix design is met. Show all required original approved design mix data and batch <br />adjustments and substituted material on an Agency approved concrete delivery ticket. The <br />Engineer may disqualify any concrete production facility for non-compliance with specification <br />requirements. <br />344-3.5 Delivery: For cast -in-place applications, the maximum allowable mixing and <br />agitation time of concrete is 90 minutes. <br />Furnish a delivery ticket on a form approved by the Agency with each batch of <br />concrete before unloading at the placement site. The delivery ticket shall be printed. Record <br />material quantities incorporated into the mix on the delivery ticket. Ensure that the Batcher <br />responsible for producing the concrete certifies that the batch was produced in accordance <br />with these Specifications and signs the delivery ticket. The Contractor shall sign the delivery <br />ticket certifying that the concrete was batched, delivered and placed in accordance with these <br />Specifications. <br />The Contractor shall be responsible for rejecting loads of concrete that do not <br />meet the plastic properties of the approve mix design or the minimum compressive strength <br />requirements. <br />01025-33 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\0455-8th Street Sidewalk Improvements 18th Ct to Old Dixie\Admim\bid <br />documents\Technical Specifications.doc <br />