Laserfiche WebLink
Sod shall be placed around all structures, equipment pads, etc. <br />I. Watering: The areas on which the sod is to be placed shall contain sufficient moisture, <br />as determined by the Engineer, for optimum results. After being placed, the sod shall <br />be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks. <br />Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br />grow for a minimum of 60 days (or until final acceptance, whichever is latest). <br />J. Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a <br />satisfactory condition until final acceptance of the project. Such maintenance shall <br />include repairing of any damaged areas and replacing areas in which the <br />establishment of the grass stand does not appear to be developing satisfactorily. <br />Replanting or repair necessary due to the Contractor's negligence, carelessness or <br />failure to provide routine maintenance shall be at the Contractor's expense. <br />The Contractor shall maintain the sodded area up to the final acceptance date as <br />directed by the Engineer. Grass height shall not exceed 6" without mowing. Clippings <br />shall be removed from sidewalk. <br />K. Article 570-9. The first two paragraphs under this Article are deleted and the <br />following substituted: <br />The contract unit price for sodding shall include the costs of sod, fertilizer (2 <br />applications), sidewalk sweeping after mowing, mowing, pegging disposal of clippings, <br />water, tools, equipment, labor and all other incidentals necessary. <br />L. Payment shall be made under: <br />Bid Item No. 570-1 -2 Performance Turf (Sod) (Bahia or Match Exist.) - Per Square <br />Yard <br />SECTION 580 <br />LANDSCAPE INSTALLATION <br />580-1 Description. <br />Plant trees and shrubs of the species, size, and quality indicated in the plans. <br />The Engineer reserves the right to adjust the number and location of any of the <br />designated types and species to be used at any of the locations shown, in order to provide for <br />any unanticipated effects which might become apparent after the substantial completion of <br />other phases of the project, or for other causes. <br />580-2 Materials. <br />580-2.1 Plants: <br />580-2.1.1 Authority for Nomenclature; Species, etc.: For the designated <br />authority in the identification of all plant material, refer to two publications of L.H. Bailey: <br />"Hortus III" and "Manual of Cultivated Plants," and ensure that all specimens are true to type, <br />name, etc., as described therein. For the standard nomenclature, refer to the publication of <br />the American Joint Committee on Horticultural Nomenclature, "Standardized Plant Names." <br />580-2.1.2 Grade Standards and Conformity with Type and Species: Only <br />use nursery grown plant material except where specified as Collected Material. Use nursery <br />grown plant material that complies with all required inspection, grading standards, and plant <br />01025-38 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\0455-8th Street Sidewalk Improvements 18th Ct to Old Dixie\Admim\bid <br />documents\Technical Specifications.doc <br />