Laserfiche WebLink
CLARIFICATIONS / CORRECTIONS: <br />Attached is the Pre-bid Meeting minutes and sign in sheet that was held on April 15, 2010. <br />The bid opening date as noted in the Advertisement for bids; as noted 2:OOPM on Wednesday April 29_, <br />2010 -is corrected to read 2:OOPM on Thursday April 29, 2010 <br />The required bid package contents are listed in SECTION 300- BID PACKAGE CONTENTS in the <br />contract documents. All required documents shall be completely filled out and signed. <br />Attached is the Current Federal Wage Rates. FL317, Publication Date 3/12/10. <br />Section 00622 CONTRACTOR'S APPLICATION FOR PARTIAL PAYMENT and CONTRACTOR'S <br />FOR FINAL PAYMENT in the Contract Documents and Specifications shall be amended by replacing <br />both with the attached revised SECTION 00622 CONTRACTOR'S APPLICATION FOR PAYMENT, <br />PAGES 00622-1 THROUGH 00622-6. <br />The Testing Lab for the project will be Ardaman and Associates, Inc. Testing will not be included in the <br />bid. It will be managed and paid for by the County. <br />ATTACHMENTS: <br />1. Pre-bid Meeting minutes and sign in sheet held April 15, 2010. <br />2. SECTION 00300 —Bid Package Contents. <br />3. Current Wage Rates. FL317, Publication Date 3/12/10. <br />4. SECTION 00622 CONTRACTOR'S APPLICATION FOR PAYMENT, PAGES 00622-1 <br />THROUGH 00622-6. <br />*************This Addendum MUST be returned with your Bid************** <br />ADDENDUM NO. 1 is submitted by <br />and <br />Company Name ' , P. S <br />r-e,��Zn� <br />Nixon, P.E., Roadway. Production -Manager <br />Davis, Purchasing Manager <br />RC. <br />Name: V I rn W A m a - t1 n Title: <br />(Type / Printed) n <br />Authorized Signature: <br />Telephone: 7_7 a <br />Page 2 of 2 <br />Date: 2 bo <br />- -- <br />-7-7) - 77,9- Z 8 (0 2 <br />RIPublic WorksVENGINEERINGDIWSIONPROJEGTMO45Mth Street Sidewalk Improvements l8th 0 to 01dDW64DDENDUMMAddendum #Ldoc <br />