My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-139
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:58:27 PM
Creation date
10/5/2015 9:01:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Instructlo" for Form: <br />The. contractor Mott provide; anough'infotmation through `Schedule v'AWPpr9pdsheet to determine which pay-item(s). are <br />bding'.subldt, the amounts; and cost. r subleicalculattonsthe amount Will 46 calculated based 6h the. actual contract <br />u6ftprice(s.),unl,es-si6ere.lsapartitils!jblet For'paft'l;svOlOtg,.us6,tht3,un'dp;I pricessub-contract.. <br />nc actual <br />1) Enter the Date of the. certification of sublet work Was prepared. <br />-2) Enter thes6quential number of the request starting with number 1. <br />3) Enter the Feddr'al Aid project. number for the Prime Contractor if any, <br />4) Enter the Financial Project, Identification number ofthe �Contract <br />5) Enter the Qoptract, number of the Oontrapt I with the' Department. <br />6 - Enter the Countyname Where. thO work;is boingperformed. , . <br />7) enter the Nam'GL'o 'f the Pelme Contractor. <br />8) Enter the FEID number of the Prl` <br />Me Contractor. <br />9) Enter the Original ContriactAbIlar.amolint (found :to nearest whole dollar). <br />1o) Enter a "r in the space Marked Change lf'any infbrmation on the, line has chang'e'd sin'ce.tho <br />previous certification of - sublet workwatprepared. Qtherwlse, leave,blank. <br />11) Enter the Subcontractor names.: Enter all the stibcontr4dto(s) regardless of their tier, <br />42) Enter the tier number for the.subcontractor. If the, subwrittador, wicks directly e Prime <br />di Wy� for th <br />Contradtor, enter ak, I" , It Ile works one *level below,, enter a "2 and. so on. <br />13) Enter the f EID number f the Subcontractor(s). <br />14) Enter the -name of the pertinent,Contractor,or Subcontractor that. hired subcontractor. <br />15) Enter a shoo description of thework l to be performed. <br />M Enterra TP I any 'pay item for the sublet ls;�A partial su.bleti <br />M epterthe DBE, status for the subcontrac <br />ND" for DB E, "NO for non -DBE. <br />18) The Department may require subcontractor to be prequalified with the Department at, described <br />In the Special Provisions, Bid Notice: Whenever construction project's contain <br />e s1OnqAndthdB. �§dhlcltat[o.n ofl <br />certain classes. of-work-that-require-s'pe.,'cific-expertise: <br />19) One (1) dopy Of,this form s.hpil be submitted to the District Office by the contractor. <br />20) To be sl�ndd by ptin dipal-ol"the firm or someone with :the delegated authority and notarized . <br />
The URL can be used to link to this page
Your browser does not support the video tag.