My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-139
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:58:27 PM
Creation date
10/5/2015 9:01:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.02 Days to Achieve Substantial Completion and Final Payment <br />A. The Work will be substantially completed on or before the 90 day after the date when the <br />Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph <br />14.07 of the General Conditions on or before the 120 day after the date when the Contract <br />Times commence to run. <br />4.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and <br />that OWNER will suffer financial loss if the Work is not completed within the times <br />specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with <br />Article 12 of the General Conditions. Liquidated damages will commence for this portion of <br />work. The parties also recognize the delays, expense, and difficulties involved in proving in <br />a legal proceeding the actual loss suffered by OWNER if the Work is not completed on <br />time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR <br />agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall <br />pay OWNER $_288.00 for each calendar day that expires after the time specified in <br />paragraph 4.02 for Substantial Completion until the Work is substantially complete. After <br />Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the <br />romaining Work within the Contract Time or any proper extension thereof rgrantp.d by <br />OWNER, CONTRACTOR shall pay OWNER $ 388.00 for each calendar day that expires <br />after the time specified in paragraph 4.02 for completion and readiness for final payment <br />until the Work is completed and ready for final payment. <br />ARTICLE 5 - CONTRACT PRICE <br />5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the <br />Contract Documents, an amount in current funds equal to the sum of the amounts <br />determined pursuant to paragraph 5.01.A and summarized in paragraph 5.01.B, below: <br />A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract:: <br />Numerical Amount: $Sp/ 9D0' �,6 <br />_ o <br />Written Amount: Y N- - t %y <br />ARTICLE 6 - PAYMENT PROCEDURES <br />00520 - Agreement (Public Works).doc <br />00520-3 <br />FAPublic WorksIENGINEERING DIVISION PROJECTS0455-8th Street Sidewalk Improvements 18(h Ct to Old DlaieVWmiftbid documenlsW0520— Agreement (Publlc <br />Works).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.