My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-139
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:58:27 PM
Creation date
10/5/2015 9:01:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />others at the Site that relates to the Work as indicated in the Contract Documents. <br />H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the <br />Contract Documents, and all additional examinations, investigations, explorations, tests, <br />studies, and data with the Contract Documents. <br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for performance and furnishing of the Work. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-9); <br />2. Notice To Proceed (page 00510-1) <br />3. Public Construction Bond (pages 00610-1 to 00610-3); <br />4. General Conditions (pages 00700-1 to 00700-45); <br />5. Supplementary Conditions (pages 00800-1 to 00800-10); <br />6. Special Provisions (pages 01009 to 01009-3) <br />7. Division 1 General Requirements (01024-1 to 01710-2) <br />8. Division 2 Technical Provisions (Technical Provisions -1 to Technical Provisions 24) <br />9. Drawings consisting of a cover sheet and sheets numbered 1 through 27, & SW 1 <br />through SW4 inclusive, with each sheet bearing the following general title: 8TH Street <br />Sidewalk Improvements from 18th Court to Old Dixie Highway, Proiect #0455, dated <br />June 2007. <br />10. Addenda (numbers to , inclusive); <br />11. Appendices to this Agreement <br />Appendix A - Permits <br />Appendix B — Federal Required Contract Provisions <br />12. CONTRACTOR'S BID (pages 1 to 8, inclusive) <br />00520 - Agreement (Public Works).doc <br />00520-6 <br />F:1Public W oft%ENGINEERING DIVISION PROJEGTSt045"th Street Sidewelk Improvements 18th CA to Old DixieWtIff* bid documenlst00520 - Agreement (Pubdc <br />Works).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.