Laserfiche WebLink
BOOK 47 PACE 68 <br />OF $4,691,86, WITH THE NORMAL STIPULATION THAT BY APPROVING THE CHANGE <br />ORDER THE COUNTY DOES NOT WAIVE ANY RIGHTS IT HAS TO CLAIM DAMAGES <br />AGAINST THE CONTRACTOR OR THE ARCHITECT BECAUSE OF OMISSIONS OR OTHER <br />REASONS THAT MAY ARISE. <br />ARCHITECT 11C_H i,NGE A ❑ <br />V RCN17fC7 D <br />ORD tR CONTRACTOP. D <br />FIELD ❑ <br />AIA DOCUMMT G701 OTHER <br />PROJECT: Indian River -County C;4ANGE ORDER NUMBER,: 59 <br />iname.address) County Administration Bldg. <br />10 (Contractor) <br />F Reinhold Construction Inc. <br />P,O,Box 666 <br />Cocoa, FL 32922 <br />—1 ARCHITECT'S PROJECT NO: 9363 <br />CONTRACT FOR Add i t ions and Renovations <br />L_ I CONTRACT DATE -.4/2/80 <br />YOU are directed to make the following changes in this Contract: <br />CP -97 Replace existing hollowcore doors with "C" label fire <br />doors at S122, S118, S.116, x,108„S120, S117, S121, t, <br />Si06. Reuse existing hardware where possible, and <br />coordinate with hardware schedule. At owners request <br />to correct unforeseen conditions. <br />he proposed changes in the work may result In additional time <br />eou)red beyond the contract completion date. Additional time <br />ill be added to the contract that is directly related to this change <br />rder. The contractot will be paid for the additional required days <br />t the rate of$300.00 (three hundred) per day for fixed overhead <br />osts. The number of days requested are not reflected In the attached <br />ocuments. <br />S4,691.86 <br />he original Contract Sum was . . . . . . . . . . . . . . . . . . . . . s 2 , 748, 000.00 <br />et change by previous Change Orders . . . . . . . . . . . . . . . . . . $ 326,151.43 <br />he Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . S 3,074, 151.43 <br />he Contract Sum will be (increased) (XM(9AXXp(pfX1f@L#Vli=y this Change Order . . . S 4,691 .86 <br />he new Contract Sum including this Change Order will be . . . . . . . . . . . S 3,078,845.29 <br />he Contract Time will be (increased) (decreased) (unchanged) by ( - - -) Days. <br />�r Dale of Completion as of the date of this Change Order therefore is <br />0-NNE1-1. METCALF b EDDY <br />”417E T <br />3�b �o. Dixie Highway <br />Id:eis <br />oral Gables, FL 33134 <br />�,�iCJzt J <br />417 E 7 <br />REINHOLD CONSTRUCTION INC. <br />C td RA CTC) <br />f�. d. Box %66 <br />Address <br />Cocoa, F1 32922 <br />BY <br />DATE ! <br />DOCUMENT G7a1 - CHANCt ORDtR - APRIL 1970 EDITION - AIAE3 - m 1970 - THE <br />'�IRICAN 1PiS711U7E Or ARCHI7EC7S, 1715 NEW YORK AVE., NW. WASHINCTUN, D.0 20006 <br />s <br />INDIAN RIVER COUNTY <br />9W 14th Ave <br />Address <br />Vero Beach, FL 32960 <br />DATE <br />ONE PACE <br />L <br />