Laserfiche WebLink
TO: The Honorable Members of the DATE: July 14, 1981 <br />Board of County Commissioners <br />FILE: <br />SUBJECT: Application by Mr. R.S. Reeves, <br />8180 Jungle Trail, Indian River <br />County, to the Florida D.E.R. for <br />a permit to construct.stone bulkhead <br />west of Jungle Trail along the <br />• Indian River <br />FROM: Neil A. Nelson REFERENCES: <br />County Administrator <br />DESCRIPTION AND CONDITIONS <br />Mr. Reeves constructed a 320 foot long coquina and coral bulkhead along the <br />eastern shore of the Indian River at Wabasso in late 1980. The D.E.R. has <br />investigated the site and determined that the wall partially severed tidal <br />influence over the nearshore river bottoms where mangrove and other natural <br />species thrive. The D.E.R. is rquiring Mr. Reeves to apply for an after -the - <br />fact permit and has requested that openings.be punched in the wall, as was <br />agreed by the applicant. Tb comply with the D.E.R., certain County approvals <br />must be given. These local requirements are: <br />1) Application must be made to the Board of County Commissioners <br />requesting a permit for construction. Applicant has requested <br />this permit in his letter dated July 8, 1981. <br />2) The Board of County Commissioners shall be provided with a <br />biological survey and ecological study. This survey is attached <br />as prepared by Reese Kessler, D.E.R. This report shall be read into <br />the record at a County Commission Board meeting. <br />After the Board's decision to approve/disapprove this permit, the applicant <br />mast obtain a copy of the minutes of the meeting or an appropriate indication <br />of the local approval and submit same to the D.E.R.-to.complete the D.E.R. <br />permit application. <br />ALTERNATIVES AND ANALYSIS <br />The County Engineer, Tommy Thomas, Reese Kessler with the D.E.R., Haynes <br />Johnson with the Corp. of 2ngineers, and the applicant have met at the <br />construction site and have agreed upon the conditions of this "after -the - <br />fact" permit procedure. The wall has been built in accordance with D.E.R.'s <br />recommendations and necessary precautions to protect the ecology have been made. <br />Two alternatives are available: <br />1) The Board can approve the biological survey and thereby approve <br />the project and issuance of a permit. The impact this approval <br />would have involves allowing.the modified bulkhead/breakwater to <br />serve as an erosion proiaction structure and not causing harm to <br />the environment. D.E.R. is in agreement with this alternative. <br />2) The Board can dens- this request and not approve the biological survey. <br />The impact this action would have involves requiring removal of the <br />bulkhead/breakwater and not permitting this method of erosion control <br />west of the 320' portion of Jungle Trail. <br />REC03LV MATIONS AND F[JIING <br />Recommend approval of an Indian River County permit to construct a 320 linear <br />foot bulkhead along the east bank of the Indian River along the applicant's <br />property (R.S. Reeves) 3180 Jungle Trail and the adoption of the standard <br />D.E.R. form resolution by Indian River County. <br />There are no funding considerations to be considered for this item. <br />AUG 51981 <br />L- - <br />BOOK 17 PAGE 11.3. <br />