My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/2/1981
CBCC
>
Meetings
>
1980's
>
1981
>
9/2/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:18 AM
Creation date
6/11/2015 1:40:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/02/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 2 �9 1 BOOK 4 ,/ PAGE 365 <br />_ <br />CHANGE <br />ARCHIT[CT <br />ARCHITECT <br />❑ <br />ORDER <br />CONTRACTOR <br />FIELD <br />B <br />❑ <br />A/A DOCUMENT 0701 <br />OTHER <br />PROJECT: Indian River County <br />(name. iddress) County Awministration Bldg. <br />TO (Contractor) <br />F Reinhold Construction Inc. <br />P.O,Box 666 <br />Cocoa, FL 32922 <br />CHANGE ORDER NUMBER: 66 <br />ARCHITECT'S PROJECT NO: 9363 <br />CONTRACT FOR: Add i t ions and Renovations <br />L I CONTRACT DATE:4/2/80 <br />You are directed to make the following changes in this Contract: <br />CP -105 Provide secondary drainage (safety) pans for the <br />two air handling units located above the stairs S254 t; <br />S246 and drain to the outside in the two story portion <br />of the East wing south* At the request of the Owner. $ 4,789.21 <br />CP -107 Remove two radiant heaters, one each, In rooms N110 & N113. <br />Cap off the piping and patch wall as required. $ 383.78 <br />The proposed changes in the work may result in additional time <br />required beyond the contract completion date.. Additional time <br />will be added to the contract that is directly related to this change <br />or,�er. The contract€at will be pard for the additional required days <br />az �,,ie rate of$300.00 (three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected in the attached <br />documents. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . $ 2,748,000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . S 339,327.24 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . $ 3.08327.24 <br />The Contract Sum will be (increased) L i>�> f 2ii4�t 'i 4 by this Change Order. . .$ ?,1172.99 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . $ 3,092,500.23 <br />The Contract Time wilt be (increased) (decro Ised) (unchanged) by (_____ } Days. <br />The Date of Completion as of the date of th Change Order therefore is . <br />CONNELL METCALF & EDDY REINHOLD CONSTRUCTION INC. INDIAN RIVER COUNTY <br />1ISTY Soo. DixIe Highway "dR�ox %66 °W Ave <br />Address ddress Addres <br />Coral Gables, FL , <br />X3134 Cocoa, F1 32922 Ve.o a F 3 <br />BY <br />DATE U DATE `I — t / — (, DATE <br />AIA DOCUMENT G7e1 • CHANGE ORDER • APRIL 1970 EDITION • AIA6 • m 1970 • THE <br />AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 <br />ONE PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.