My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/16/1981
CBCC
>
Meetings
>
1980's
>
1981
>
9/16/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:19 AM
Creation date
6/11/2015 1:44:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
►� A Z u <br />BOQK ,1 PAGE 51 .. <br />CHANGE AR HITtCT <br />~TRACTOR <br />ORDER FIEELD D <br />AIA DOCumfNT 0701 OTHER <br />nOJECT: Indian River County <br />CHANCE ORDER NUMBER: 67 <br />n me Idd.ess) County Administration Bldg. <br />TC) (Contractor) --1 ARCHITECT'S PROJECT NO: 9363 <br />Reinhold Construction Inc. CONTRACT FOR: Add i t ions and Renovations <br />P- o,13ox 666 <br />Cocoa, FL 32922 <br />L_ CONTRACT DATE: 4/2/30 <br />°;'ou are directed to make the following changes in this Contract: <br />Cp_109 Replace one(1) 41, gate valve-IBBM- flanced ends. <br />Replacement of this valve is necessary to co-plete 7G$,59 <br />testing of piping system. An unforeseen cocition <br />Cp-114 Repair the two (2) missinq awnirq type panes In the <br />window to Room 5164. The repairs to equal Gid catch the existing.$ 1,092.29 <br />AT OWNER'S REQUEST. <br />(NOTE: SEE CLARIFICATION CP -114 DATED 8/214/_21) <br />Replace avminq type window in rope, 5164- to rr.atch Exis:inq. <br />as requested by owner. <br />The proposed changes In the work may result in additional time <br />required beyond the contract completion date; Additional time <br />will be added to the contract that is directly related to this change <br />order, ilie eontractof will be paid for the additional required days <br />at the rate of$300.00 (three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected In the attached <br />sdocurr.entS. $ 2,748,000.00 <br />The original Contract Sum was . . . S 344,500.23 <br />Net change by previous Change Orders . . . . . . . • • • • • • . S 3,092,500.23 <br />The Contract Sum prior to this Change Order was . . . . . . . . . • . • <br />The Contract Sum will be (increased) Cai�C4�?si�i!? 2S1n},ktt` yY this Chance Ower . S ; ,094,391 . 1 1 <br />The new Contract Sum including this Change Order will be . . . • • • • . • . (-----) DaNs. <br />The Contract Time will be (Increased) (decreased) (un�hangcd) by <br />he Date of Completion .s of the date of this Change Order therefore ,s <br />COI,t�ELL METCALF & EDDY REINHOLD CONST=UCTION INIZ. <br />I.PrW 7,,o - [PN'-RACi09, <br />0 DI HlghwaY PP Box 666 <br />e.ddress Address <br />Coral Gables, FL 33134 Cocoa, F1 �2 <br />Ly - <br />1D A,T f <br />y DATE <br />� 1\ <br />DATE C <br />AIA DOCUVANT 0711 - CHANCE ORDER - APP.I1 1970 EDITION - AIA.0 - C 1970 - THE <br />AmiR.CAN I\STITUTE Or ARCHITECTS, 1735 NEN YORK AVE., Nw, K,SHINCTON, D C. 20CVb <br />IND Ir.N RIVER COUI.TY <br />14th Ave <br />Address <br />Veraleach-, Fr 32c,16R, <br />ATE i L /�� <br />O%E PACE <br />
The URL can be used to link to this page
Your browser does not support the video tag.