My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/16/1981
CBCC
>
Meetings
>
1980's
>
1981
>
9/16/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:19 AM
Creation date
6/11/2015 1:44:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRACKING STATION PARK GRANT APPLICATION <br />Boox 47 PAGE 529 \ <br />COMMISSIONER BIRD EXPLAINED THE HISTORY OF APPLYING FOR FUNDS <br />TO DEVELOP THE_TRACKING STATION PARK, NOTHING THAT THERE ARE ADDITIONAL <br />FUNDS AVAILABLE THIS YEAR AND WE HAVE BEEN ENCOURAGED TO TRY AGAIN. <br />HE AND ENGINEER .JIM DAVIS REVIEWED THE REVISED CONCEPTUAL PLANS FOR <br />BOTH THE NORTH AND SOUTH TRACTS OF THE PARK SITE AND EXPLAINED THAT <br />THE INTENTION IS TO REMOVE THE OLD TRACKING STATION STRUCTURE AT THE <br />NORTH END OF THE PARCEL AND ALLOW FOR MORE PARKING. ALSO, THEY ARE <br />PLANNING ON INTERCONNECTING THE TWO PROJECTS STRICTLY FOR MAINTENANCE <br />PURPOSES WITH A ROAD CLOSED OFF BY A GATE AT EACH END. THE PLAN IS <br />AIMED AT PRESERVING THE NATURAL VEGETATION AS MUCH AS POSSIBLE BY <br />CLUSTERING THE PARKING AND INTERSPERSING PICNIC PAVILIONS AMONG THE <br />TREES RATHER THAN PUTTING IN AN ASPHALT PARKING LOT. THE CONCEPT <br />FOR THE NORTH TRACT WHERE THE SEWAGE TREATMENT PLANT IS LOCATED IS <br />TO-PMVI:DE- PARKING AND AN OVER THE DUNE CROSS—OVER. A 50' BUFFER IS <br />PART OF THE PLAN, <br />COMMISSIONER BIRD NOTED THAT THE PLANS DISPLAYED ARE A <br />PREVIEW OF THE CONCEPTUAL PLAN FOR THE NORTH TRACKING STATION SITE <br />AND A FAIRLY FINAL PLAT FOR THE SOUTH TRACKING STATION SITE. THE COST <br />ESTIMATE FOR IMPROVEMENTS ON THE SOUTH SITE ARE $277,5001 AND THEY <br />WOULD LIKE TO HAVE ACTION TODAY ON THE RESOLUTION REQUIRED FOR THE <br />COUNTY TO GO AHEAD WITH OUR APPLICATION TO THE STATE FOR FUNDING. <br />ROBERT LATTA CAME BEFORE THE BOARD REPRESENTING PEBBLE BEACH <br />VILLAS CONDOMINIUMS AND REPORTED THAT HE AND JACK MACDONALD OF THE <br />TAXPAYERS ASSOCIATION STUDIED THE PROPOSED PLANS AND FELT MR. DAVIS <br />HAD BEEN MOST COOPERATIVE IN LISTENING TO THEIR SUGGESTIONS. THEIR <br />MAIN CONCERN WAS THEIR EXISTING BOARDWALK WHICH THEY HAVE BEEN ASSURED <br />WILL BE LEFT AS IT IS, AND THEY, THEREFORE, HAVE NO OBJECTION TO THE <br />CONCEPTUAL PLANS AND FEEL IF THEY ARE FOLLOWED THROUGH, IT WILL BE <br />VERY SATISFACTORY. <br />JACK MACKEY SPOKE ON BEHALF OF INDIAN RIVER SHORES AND AGREED <br />WITH MR. LATTA'S COMMENTS, <br />MOTION WAS MADE BY COMMISSIONER BIRD, SECONDED BY COMMISSIONER <br />SCURLOCK, TO ADOPT RESOLUTION 81-63 STATING THAT THE COUNTY INTENDS TO <br />APPLY TO THE DEPARTMENT OF NATURAL RESOURCES FOR A 2/1 MATCHING GRANT <br />TO MAKE IMPROVEMENTS TO THE SOUTHERN PORTION OF THE TRACKING STATION <br />RECREATION AREA AND THE CHAIRMAN BE AUTHORIZED TO SIGN. <br />
The URL can be used to link to this page
Your browser does not support the video tag.