My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/2/1981
CBCC
>
Meetings
>
1980's
>
1981
>
12/2/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:20 AM
Creation date
6/11/2015 1:45:44 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/02/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 28, 1981 <br />Mr. Neil Belson <br />c/o John Robbins <br />Board of County Comissioners <br />2145 14th Avenue <br />Vero Beach, FL 32960 <br />RE: Indian River County <br />Production Test Well <br />Dear Mr, Nelson: <br />The following are prices on a third production test well for the extension <br />of contract for South County Taxing District Test and Supply wells: <br />1.0 FLORIDAN AQUIFER OSSERVATIO;l PRODUCTION WELL: For drilling <br />one Floridan Aquifer Observation Production Well to the depth <br />of 700 feet and for furnishing and delivering at the site of <br />work any and all supplies of whatever nature that may be <br />required to perform the work in a satisfactory manner and <br />to carry it to completion; including labor and all manner of <br />facilities; including required drill rigs; including <br />mobilization and demobilization to complete the work; all as <br />specified. Included in lump'sum price is: <br />400 feet of 12 -inch Schedule 40 PVC casing, 300 feet of <br />12 -inch open hole, 20 hours of development time, eight (8) <br />hours of pump test, plus geophysical logs, 3 -foot by 3 -foot <br />concrete apron, and all other necessary incidentals. <br />LUMP SUM PRICE OF <br />MOBILIZATION <br />1.1 For furni Shing. hol a and materials for <br />installing more or less than 400 feet <br />of 12 -inch Schedule 40 PVC casing. <br />$42,538.00 <br />2,950.00 <br />$45,4B8.00 <br />$ 45.00/ft. <br />DEC 2 1981 <br />. �� <br />g �+ /� �/ <br />PIPPIN <br />REPLY TO: P.O. PAX 6650 <br />CORPORATION <br />LAKE <br />FLOAiDA 33451 <br />3346 <br />4y, <br />�~ <br />PH. (305% 267-5620 <br />GROUNDWATER EXPLORATION & DEVELOPMENT <br />TELEX: 803472 <br />_CABLE: APCCZ?RIt: <br />July 28, 1981 <br />Mr. Neil Belson <br />c/o John Robbins <br />Board of County Comissioners <br />2145 14th Avenue <br />Vero Beach, FL 32960 <br />RE: Indian River County <br />Production Test Well <br />Dear Mr, Nelson: <br />The following are prices on a third production test well for the extension <br />of contract for South County Taxing District Test and Supply wells: <br />1.0 FLORIDAN AQUIFER OSSERVATIO;l PRODUCTION WELL: For drilling <br />one Floridan Aquifer Observation Production Well to the depth <br />of 700 feet and for furnishing and delivering at the site of <br />work any and all supplies of whatever nature that may be <br />required to perform the work in a satisfactory manner and <br />to carry it to completion; including labor and all manner of <br />facilities; including required drill rigs; including <br />mobilization and demobilization to complete the work; all as <br />specified. Included in lump'sum price is: <br />400 feet of 12 -inch Schedule 40 PVC casing, 300 feet of <br />12 -inch open hole, 20 hours of development time, eight (8) <br />hours of pump test, plus geophysical logs, 3 -foot by 3 -foot <br />concrete apron, and all other necessary incidentals. <br />LUMP SUM PRICE OF <br />MOBILIZATION <br />1.1 For furni Shing. hol a and materials for <br />installing more or less than 400 feet <br />of 12 -inch Schedule 40 PVC casing. <br />$42,538.00 <br />2,950.00 <br />$45,4B8.00 <br />$ 45.00/ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.