My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/2/1981
CBCC
>
Meetings
>
1980's
>
1981
>
12/2/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:20 AM
Creation date
6/11/2015 1:45:44 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/02/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL DEV1LOPMENT UTILITIES, INC. ORIGINAL SHEET NO. 4.0 <br />VERO SHORES AND VERO BEACH HIGHLANDS DIVISION <br />(Continued from Sheet No. 3.0) <br />Connection (plant capacity)_- Water: $ 0.50 <br />Sewer: $ 0.75 <br />Extension charges are stated at the charge per foot measured <br />along front of the property to be served. <br />' o <br />Main Extension Charge Water: $ 5.00 <br />Sewer: $12.00 <br />5.01 Main extension charges for service to customers outside <br />Utility's certificated service area will be negotiated. <br />(a) Such customers may be required to advance the full <br />cost of on-site and off-site .mains, subject to refund of <br />portions thereof in excess of the contributor's hydraulic <br />share. <br />(b) In addition to payment of the above, connection (plant <br />capacity) charges will be required to support excess plant <br />capacity dedicated to the contributor. <br />4.0 GALLONS PER DAY, ,VATER AND SFiVER nF!LV D C:�aRACT ERIST ICS . <br />In Exhibit A, attached hereto, is a list of daily rated <br />gallons of demands for various occupancies :yhicr. ;iill be <br />used in ccmputing Connection (plant capacity`, and :Main <br />Extension Charges. In the instance of common facilities <br />for multiple dwelling units such as irrigation, laundering, <br />recreation facilities, and commercial and coy:u�erciai/resi- <br />dential facilities, determination of cc-ne-t_on io'_ant <br />capacity) and :-gain extension charges wJ 1 be bases upon t e <br />use characteristic defined by en1-ineeri.g data surplied <br />by the prospect -ire contributor, as accepted by i"tili ter. <br />(25-10.121(11), F.A.C. ) <br />5.0 PREPAPLA T I0:`: OF DE"ELOPE AGiZE=%1E` ; S . <br />Utility may require that the contributor, in addition to <br />the fees and charges set forth herein, bear the cost of <br />preparation of developer agreement by independent counsel <br />or persons qualified to draft and prepare such a;reements. <br />Said charges shall rot exceed that amount ncr.,,al1y _o be <br />contemplated for such service. <br />(25-10.137, F.A.C.; 1-5-10.139, F.A.C.) <br />6.0 A!ATER A`;D SEINER CAPACTTN' .ILLC'C1710''S <br />Upon payment by the contributor and _;.s proper execut-": <br />of an agreement _or service ay.11aDillt`% PU:'SL1ant to thZJc? <br />rules, Utility will reserve and wi 11 allccate to the <br />(Continued to Sheet No. 5.0) <br />DEG c' ���� Gerard P. ,bzia418 e��F 8 <br />K+ President ���� <br />
The URL can be used to link to this page
Your browser does not support the video tag.