My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/2/1981
CBCC
>
Meetings
>
1980's
>
1981
>
12/2/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:20 AM
Creation date
6/11/2015 1:45:44 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/02/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL DEVELOPMENT UTILITIES, INC. ORIGINAL SHEET NO. 8.0 <br />VERO SHORES AND VERO BEACH HIGHLANDS DIVISION <br />12:0 INSPECTION OF PLUMBER'S HOOK-UP. <br />It shall be the responsibility of the contributor or its <br />plumbing contractor to connect contributor's plumbing in - <br />CP <br />stallation with the. water or sewer system. Utility re- <br />serves the right to inspect all such connections to be <br />assured that the same are properly made in accordance with <br />Utility's rules governing such connections, and that the <br />connection, as made, is free from infiltration. <br />The contributor shall notify Utility of any proposed inter- <br />connection with the facilities of Utility, and connection <br />may be made without the presence of Utility's inspector. <br />However, such connection shall remain open until inspec- <br />tion by Utility and until notice of the approval of such <br />connection is furnished to the developer in accordance <br />jvith the practices and procedures of Utility. any connec- <br />tion covered without the benefit of inspection will result <br />in the contributor being required to reopen the connection <br />for subsequent inspection. If Utility fails to inspect <br />the connection within 48 hours after notice that the same <br />is ready to inspect, the connection shall be deemed approved <br />by Utility. <br />13.0 ADJUSTMENT PROVISIONS. <br />Governmental Authority: The charges set forth in this <br />Policy are subject to adjustment by appropriate action of <br />the governmental agency having jurisdiction o� this Pclicy <br />either upon the initiative of the governmental agency or <br />by request of Utility. (25-10.141, F.A.C.) <br />14.0 . PRIOR POLICY. <br />Prior to `he adoption of this Policy, Utility had, by virtue <br />of its obligations, established other -policies which will <br />remain in effect until the obligations pursuant to those <br />policies have been fulfilled. Under a previous program, <br />Utility constructs water facilities at its own cost cover- <br />ing approximately 51,775 lots to which water service would <br />be extended by Utility within sixty days after the building <br />permit has been obtained and notification of commencement <br />of construction has been given to Utility. The cost of <br />such water facilities is to be borne solely by Utility as <br />an investment. The only charge to the customer would be <br />a meter installation fee. Utility made a commit ent to <br />provide seiner service to approximately 4,341 lots, and <br />facilities will be installed as.an investment of Utility <br />1 •. <br />(Continued to Sheet No. 9.0) <br />Gerard P. Mozian <br />President {{��r� <br />BQOK 48 PAPF,302 <br />
The URL can be used to link to this page
Your browser does not support the video tag.