My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/19/1982
CBCC
>
Meetings
>
1980's
>
1982
>
5/19/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:38 AM
Creation date
6/11/2015 2:26:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/19/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. _ j `4 wiz--4c��..aY-LL�� .. �, . _ r '�, ri � �'.t ,,,,t5.� � � -7� .X ''' <`x"'j.,r..., �a«w. s,`' +_-:''.-�- .G+i moi, �, -r r..�������yy}�� � .,� "'3"` �'-•'�++�•�k3'� .-�'i�� <br />a*^e •. �..,.. W �. �. r_e, _ >z_ ...+�5. - __ •-"mss. a-.. <;�.�� _�.-�� _v��_��r"�s>s ""'�^:.h� - <br />Contract No. <br />SECTION M <br />CONTRACT CHANGE ORDER FORM <br />Date Apri 1 30, 1982 <br />Change Order No. 4 Location Pebble Bay Sewerage Area <br />To: (Contractor) Bain Underground Utilities, Inc. <br />You are hereby requested to comply with the following changes from the contract drawings &c specificatio <br />Item <br />No. <br />Description of Changes — Quantities, Units, Unit Prices, <br />Change in Completion Schedule, Etc. <br />Decrease in <br />Contract Price <br />Increase in <br />Contract Fri, <br />l <br />3 <br />4 <br />1 <br />Contractor shall substitute the No. 410 manhole <br />frame and cover as changed in Change Order No. 1 <br />for No. 33A manhole frame and cover, as manufac- <br />tured by U.S. Foundry & Manufacturing Corporation, <br />Miami, Florida, or equal. (Total deduct = $200., <br />deduct for No. 410 = $120., therefore, net addi- <br />tional deduct = $80.) <br />80.00 <br />Change in contract price due to this Change Order: <br />' <br />Total Decrease <br />Total Increase <br />Difference between Col. (3) and (4): <br />Net (increase) (decrease) contract price <br />S 80.00 <br />xxxxxxxxxx; <br />xxxxxxxxxxx <br />S <br />S 80.00 <br />S <br />S 80.00 <br />The sum of $ 80.00 is hereby MICK deducted from, the total contract price, a <br />the total adjusted contract price to date thereby is S 116,578.35 <br />The time provided for completion in the contract is unchanged, Xi LA=Xrd&MW, by -0- <br />calendar days. This document shall become an amendment to the contract and all provisions of t <br />contract will apply hereto. �+ <br />Accepted by: 0e, <br />Contractor Date <br />Recommended by: <br />i r Date <br />Requested by: 02-/ <br />Owner Date <br />NOTE: Work performed under this change order prior to Owner's concurrence is at the Contracts <br />1J Anowoved a -..,o fon-n <br />and legal , fia//i/ ilc;rr' , <br />/ foil, <br />
The URL can be used to link to this page
Your browser does not support the video tag.