My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/19/1982
CBCC
>
Meetings
>
1980's
>
1982
>
5/19/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:38 AM
Creation date
6/11/2015 2:26:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/19/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.:,__.<:...�'ti.�i:'^`.*3?!..eri � 5s .k�..-�•n.>_ .•a..%�'~?,xM�,�-•�.=.r»va�.x��c-_.e!.:--.�.,-._:::+t�+u�.»� m.�. a.s.=�"ir��..,i.�=-____-?� .t. »,�P.sa �Y_-:.�-.,c_t�•�S--a�.w..��:• �-ms's ...,,..:: <br />May 3, 1982 <br />Mr. David L. Greene <br />Assistant County Administrator <br />1840 - 25th Street <br />Vero Beach, FL 32960 <br />Subject: Pebble Bay Sewerage Area <br />Wastewater System Improvements <br />Indian River County, Florida <br />Engineer's Project No. 6765 <br />Dear David; <br />Svei . - ria Q Parcel <br />and Associates, Inc. <br />Seas 20th Bnset <br />suns 4 <br />Vero B&wh. ibrW& =W <br />3M,%2 -2M <br />Enpmeers <br />Armteaq <br />Ptenners <br />Please find enclosed five (5) original copies each of Change Order Num- <br />bers 3 and 4 which require execution by Indian River County, Please <br />note Change Order No. 3 is for the $1,500 increase in contract price <br />as negotiated between Bain Underground Utilities and the Board of Coun- <br />ty Commissioners, As this item was negociated directly with the Board <br />and notthrough our office, we feel it does not require our signature. <br />Change Order No. 4 represents a deduct in contract price of $80 to al- <br />lovt for the substitution of No. 33A manhole frames and covers in lieu <br />of No. 410 manhole frames and covers. Please note, Change Order No. 1 <br />represented a contract deduct for manhole frames and covers and the <br />deduct for Change Order No. 4 is in addition to Change Order No. 1. <br />Please also note, the change in manhole frames and covers has been re- <br />quested by the City of Vero Beach as documented by the attached letter <br />to Change Order No. 4 . <br />Also enclosed is a copy of a letter from Bain Underground Utilities, <br />Inc., detailing their Lump Sum break down for lowering Lift Station No. <br />1, 2 feet. The necessity of lowering Lift Station No. 1 is a result of <br />lowering the gravity sewer and manhole on the adjacent Town of Indian <br />River Shores project in which Lift Station No. 1 is connected. Also in- <br />cluded in Bain's letter is a request for a 30 day time extension for this <br />project due to the delays caused by lowering Lift Station No. 1. As you <br />recall these items were discussed in our meeting of April 27, 1982, in <br />the Law Office of Larry Barkett. <br />The items in Bain's letter which we received on April 30, 1982, (copy <br />attached) should be placed on the agenda for discussion at the next Coun- <br />ty Commission meeting for.Board Approval. <br />Q.wmw & P.rp.t -4 Mao&-" w4 & s 2~V.6, avn,"y <br />
The URL can be used to link to this page
Your browser does not support the video tag.