My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-41 (2)
CBCC
>
Ordinances
>
1980'S
>
1983
>
1983-41 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 10:47:22 AM
Creation date
10/5/2015 9:48:12 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1983-41
Adopted Date
11/28/1983
Agenda Item Number
DUPLICATE
Ordinance Type
DUPLICATE
Supplemental fields
SmeadsoftID
13021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- <br />excluding, however, any of the aforementioned vehicles when <br />operated by the State of Florida or a political subdivision of the <br />State of Florida, or those operations which have received the <br />express authorization of the Board of County Commissioners. <br />E. Notwithstanding the foregoing provisions, during <br />construction in the vicinity of the main dune, an applicant who <br />has received the express written approval of the Bureau of Beaches <br />and Shores of the Department of Natural Resources to carry on <br />construction activity seaward of the Coastal Construction Control <br />Line may make use of a leeway zone of up to fifteen (15) feet <br />seaward of said Control Line for those activities related to <br />construction of improvements up to or landward of the Control <br />Line. No permanent improvement or structure may be made in the <br />leeway zone and, prior to encroachment therein, a temporary <br />barrier running parallel to the Coastal Construction Control Line <br />shall be placed at the most seaward extent of the leeway zone to <br />identify the limits beyond which no encroachment of any kind may <br />occur; provided, however, all activities related to construction <br />of an approved dune crossover or elevated bridge shall be governed <br />by the authorization given under paragraph C above. All proposed <br />activity within the fifteen (15) foot leeway zone shall be <br />described in writing and submitted to the Environmental Planner <br />for prior approval, in addition to the approval by the Bureau of <br />Beaches and Shores required above. Approvals required under this <br />paragraph may be obtained concurrently with site plan or <br />subdivision approval, as the case may be, but must be obtained in <br />any event prior to the scheduled activity. The leeway zone shall <br />be revegetated with natural indigenous dune vegetation upon <br />completion of construction activities and prior to the issuance of <br />any certificate of occupancy for the subject improvements. The <br />applicant remains responsible for successful reclamation of the <br />dune vegetation temporarily destroyed under this paragraph. <br />SECTION 11 <br />APPLICATION PROCEDURE AND FEES <br />A. Application for issuance of any permit required by <br />-14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.