My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/7/1982
CBCC
>
Meetings
>
1980's
>
1982
>
7/7/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:08:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/07/1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL 7 1982 <br />Dox 50 Pnr?�2 <br />ATTACHMENT #1 <br />PROJECT LOCATION: Indian River County } <br />Courthouse Annex, 2nd Floor, <br />2145 14th Avenue <br />Vero Beach, Florida 32960 <br />SCOPE OF PROJECT: <br />The scope of this project shall consist of two phases; <br />Phase 1 - Program Development <br />Phase 2 - Basic Services as described in Article 1, Section <br />1.1 through --Section 1.5 including normal <br />structural, mechanical and electrical engineering <br />services and those items included in Article 15 and <br />those items specifically set forth below. <br />PHASE 1: <br />Phase 1 shall consist of the following: <br />Architect shall prepare a program for a 4th Courtroom for the <br />Indian River County Courthouse Annex, 2nd Floor. The Architect <br />shall interview and ascertain the respective requirements of the <br />Circuit Judges, County Court Judge, the Indian River County Bar <br />Association, the Clerk of the Circuit Court and representatives of <br />the County Commission for the construction of a 4th Courtroom for <br />the Indian River County Courthouse., The Architect shall <br />investigate existing conditions on -the 2nd Floor of the Courthouse <br />Annex. Based upon conditions existing at the Courthouse Annex and <br />information gathered from the interviews with respect to the needs <br />of those who will be using the facility, the Architect will <br />develop a basic project program with alternates with budget <br />estimates of probable construction costs of each and shall present <br />the basic project program together with alternates to the County <br />Commission. The County agrees to review the basic project program <br />and alternates and select a program from the basic program, <br />alternates, a combination thereof, or the program as modified at <br />the discretion of the Board and shall further establish a proposed <br />project budget. <br />Architect shall finish Phase 1 as soon as possible but, in <br />any event, within one hundred and twenty (120) days of the execu- <br />tion of this contract. <br />PHASE 2: <br />Architect shall design a 4th Courtroom for the Indian River <br />_County Courthouse Annex, 2nd Floor, complete for use as intended, <br />including but not limited to, all furnishings, audiovisual <br />equipment, electrical, mechanical, structural and plumbing. <br />Architect shall review the program selected by the County and <br />proceed with schematic design phase, design development phase, <br />construction document phase, bidding or negotiation phase and con- <br />struction phase as set forth in Article 1, Section 1.1 through <br />Section 1.5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.