My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/7/1982
CBCC
>
Meetings
>
1980's
>
1982
>
7/7/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:08:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/07/1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"Pledged Funds" shall mean the Gross Revenues. <br />"Prior Lien Obligations" shall mean the outstanding <br />Water Revenue Bonds, Series 1980 (South County Water System), <br />Anticipation Notes, dated May 1, 1981, of the Issuer. <br />"Project" shall mean the additions, extensions and <br />improvements to the System to be acquired and constructed pur- <br />suant to the authorization contained in this Instrument in accor- <br />dance with certain plans and specifications now on file with the <br />Clerk. <br />1.02 Authority for this Instrument. This Instrument is <br />adopted pursuant to the provisions of Ch. 159, Fla. Stat. (1981), <br />and other applicable provisions of law, and pursuant to <br />Subsection 3.04(J) of the Original Resolution, and is supplemen- <br />tal to the Original Resolution. <br />1.03 Findings. It is hereby found and determined that: <br />(A) The Issuer presently owns and operates a combined <br />water and sewer system for the benefit of its inhabitants, and <br />the Project is necessary for the continued preservation of the <br />health, welfare, convenience and safety of the Issuer and its <br />inhabitants. <br />(B) The Issuer has been advised by its consulting engi- <br />neers and it is hereby found and determined that the estimated <br />Cost of the Project is $7,000,000 which shall be paid with the <br />proceeds of the sale of the Bonds. <br />(C) Subsection 3.04(J) of the Original Resolution pro- <br />vides for the issuance of additional parity obligations under the <br />terms, limitations and conditions provided therein. <br />(D) The Issuer has complied with the terms, limitations <br />and conditions contained in the Original Resolution. The Issuer <br />is, therefore, entitled to issue the Bonds as additional parity <br />obligations within the authorization contained in the Original <br />Resolution. <br />(E) The revenues to be derived annually from the rates, <br />rentals, fees and other charges made and collected for the ser- <br />vices and facilities of the System are expected to be sufficient <br />to pay, as the same shall become due and payable, the principal <br />of and interest on the Bonds and the Parity Obligations, and the <br />Operating Expenses. Prior to the issuance of the Bonds, the <br />Issuer shall find and determine the estimated annual Gross <br />Revenues, Cperating Expenses and principal of and interest on the <br />Bonds. It is estimated that the period of usefulness of the <br />System will exceed 41 years. <br />-3- <br />J U L 7 1982 Boa 50' PAGE.293- <br />' <br />
The URL can be used to link to this page
Your browser does not support the video tag.