My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/7/1982
CBCC
>
Meetings
>
1980's
>
1982
>
7/7/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:08:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/07/1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r cul <br />7 198? <br />Pon the completion of all construction of - &060rwat5u, WIFA64 <br />and distribution systems, the project engineer for the Corporation <br />shall certify, under seal, that the system has been constructed <br />substantially in accordance with the plans and specifications <br />previously approved. The certification shall include submission <br />to the County of two (2) sets of "As -Built" drawings, consisting <br />of one (1) set of reproducible vellums and one (1) set of regular <br />blue line prints; and that the systems meet all of the standards <br />required by the County, including pressure and leakage tests and <br />chlorination and bacteriological tests for the water distribution <br />system. Upon receipt of certification from the engineer the <br />County will issue a letter acknowledging the construction of the <br />water system. No service is to be provided to customers until <br />such time as the County issues a letter of acknowledgment. The <br />issuance of said letter shall not be unreasonably withheld. Copies <br />of Monthly.Operating Reports required to be filed with the Florida <br />Department of Environmental Regulation shall be furnished to <br />County. <br />SECTION VII <br />W <br />All of the facilities of the Corporation shall be constructed <br />oin accordance with the plans and specifications approved by the <br />1 <br />Department of Environmental Regulation of the State of Florida and <br />W <br />F <br />0 the quantity and quality of water delivered and sold shall at all <br />IL <br />Z times be and remain not inferior to the quality standards for <br />0 <br />public water supply and other rules, regulations and standards now <br />or hereafter adopted by the Department of Environmental Regulation <br />of the State of Florida. The Corporation shall maintain <br />sufficient water pressure and mains of sufficient` size with fire <br />hydrants and other facilities necessary in the water distribution <br />system to furnish fire protection at any and all areas within the <br />territory receiving service from the Corporation. Said fire flow <br />standards shall be a minimum of 550 gallons per minute for four <br />hours for residential units of two (2) or less floors and <br />1100 gallons per minute for four hours for any commercial building <br />and residential units of three (3) or more floors. The <br />Corporation shall also supply all water to consumers <br />through individual meters which shall accurately measure the <br />amount of water supplied. The Corporation shall at any time, <br />when requested by a consumer, make a test of the <br />iWacy of any meter; priowever, to any test beide by <br />imif5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.