Laserfiche WebLink
J U L 7 1982 o 50 f� <br />Commissioner Fletcher inquired whether the Utility <br />Department has any criteria set up for a certain elevation <br />threshold or berm around a storage pond so that it would not <br />overflow when we experience heavy rains. <br />An engineer in the audience reported that DER criteria <br />calls for 3' about the maximum storage level. <br />ON MOTION by Commissioner Lyons, SECONDED <br />by Commissioner Bird, the Board unanimously <br />adopted Resolution 82-60 "River Bend Utility <br />Company Water and Sewerage System Franchise" <br />with the understanding that a copy will be <br />submitted meeting the satisfaction of the <br />Attorney and Chairman limited to sewer system <br />only. <br />