My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980-22
CBCC
>
Ordinances
>
1980'S
>
1980
>
1980-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 9:56:31 AM
Creation date
10/5/2015 9:39:32 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1980-22
Adopted Date
05/12/1980
Ordinance Type
Utilities
State Filed Date
05\08\1980
Entity Name
Uniform Set of Charges New Connections
Subject
Water and Sewer Connections
Supplemental fields
SmeadsoftID
12818
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plant Capacity Charges set forth herein may be automatically escalated <br />based upon increases in utility construction index published in <br />Engineering News Record Magazine (ENR), If ENR goes out of business <br />an equivalent index will be determined and used by the County, entitled <br />"20 cities construction cost index", using as a base, the published <br />index for the quarter ending June 30, 1980. The County shall auto- <br />matcially adjust the plant capacity construction charges set forth <br />herein semi-annually, with the first such adjustment to be not earlier <br />than December 31, 1980. Any automatic escalation shall not exceed <br />the percentage difference between said construction cost index for <br />the base period as compared with the period of comparison. <br />SECTION 3. ESCALATION BY THE INDIAN RIVER COUNTY BOARD OF <br />COMMISSIONERS. <br />Separate and apart from the automatic escalation provisions <br />set forth above, the Utilities Department of the County may file <br />with the Commission a higher or lower assessment schedule, and in <br />support of that schedule, detail the reasons requiring such increased <br />assessments. Such reasons may include and be related in increasing <br />standards of service; inadequate or incorrect estimates of the total <br />anticipated assessments versus the actual investment levels required <br />by the County for water or sewer plant treatment facilities; actual <br />experience with regard to matters of service area density having a <br />direct bearing upon assessments received versus the cost of construction <br />of the facilities; matters of net investment bearing upon rates and <br />charges required of consumers and/or such other matters which may <br />reasonably bear upon the needs, necessities or consideration requiring <br />such change. <br />SECTION 4. USE OF PLANT CAPACITY FUNDS <br />All Plant Capacity Fees paid to the County shall be deposited <br />in the appropriate fund to be held and used only for the purposes of <br />expansion of Idian River County's water supply system and waste water <br />treatment system or for the payment of the debt service on loans <br />issued for the acquisition or expansion of such systems (either as <br />the original bond issue or any refunding thereof). Any funds or <br />deposit in said funds which are not immediately necessary for expendi- <br />ture may be invested as permitted by Florida Statutes and all income <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.