Laserfiche WebLink
BAIN ' UNDERGROUND UTILITIES, INC. <br />August 16, 1982 <br />Randy Mosby <br />Sverdrup & Parcel <br />1536 20th St. <br />Vero Beach, F1., 32960 <br />Re: Open Cut on AIA <br />Pebble Bay Sewerage Area <br />Engineer's Project #6765 <br />Dear Randy: <br />P. O. Box 447 <br />Vero Beach, Florida 32960 <br />305 - 567-5651 <br />Per your phone conversation with my secretary I am sending you <br />my time and material prices for the open cut on AIA. They are <br />as follows: <br />Superintendent <br />25.00 <br />per <br />hour <br />Foreman <br />15.00 <br />per <br />hour <br />Laborer <br />12.00 <br />per <br />hour <br />310 Backhoe <br />30.00 <br />per <br />hour <br />350 Bulldozer <br />30.00 <br />per <br />hour <br />680 Backhoe <br />35.00 <br />per <br />hour <br />• 690 Backhoe <br />45.00 <br />per <br />hour <br />444 Loader <br />35.00 <br />per <br />hour <br />R-40 Ditch Witch <br />30.00 <br />per <br />hour <br />Dump Truck <br />27.50 <br />per <br />hour <br />Policeman for Traffic Control <br />Cost + <br />10% <br />- - - - All other costs incurred to be billed at Cost + 10% to include <br />but not limited to, Compaction, Density Tests, Equipment, Lime <br />Rock, And Ashphalt, etc. <br />Sin rely, <br />e - fC 4,�64 <br />Gary 7Unerground+Utilities, <br />heidt, President <br />Bain Inc. <br />GCS/gse <br />SEP 11982 <br />SERVING FLORIDA MORE THAN 25 YEARS <br />51 PA,0A 9 <br />