Laserfiche WebLink
Fr - <br />OCT 6 1982 <br />H ox 51 <br />r <br />He continued that the $3,750 would be added to the <br />construction cost, and ultimately it would reflect a change <br />in the engineer's fee which is a percentage of the <br />construction cost. <br />Commissioner Wodtke pointed out that if the contractor <br />had agreed to furnish this materially originally, it would <br />have been reflected in the contract price anyway. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />It was voted on and carried unanimously. <br />68 <br />