My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/6/1982
CBCC
>
Meetings
>
1980's
>
1982
>
10/6/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:40 AM
Creation date
6/11/2015 2:33:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/06/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � <br />- 51- <br />OCT <br />OCT 6 <br />1982 <br />Eckerd's, but he has not been given an answer yet. He also <br />has not been given an answer as to what to do with the fence <br />in front of Pebble Bay Life Station #1; although, he <br />requested the inspector for instructions about this on July <br />12th. In addition, they are still discussing a change order <br />for an overload relay support, which has not been settled. <br />Mr. Scheidt emphasized that he cannot complete a change <br />order item until he receives official notice that the change <br />order is accepted, and, therefore, there are some things <br />outstanding that he cannot do. <br />Discussion continued as to other items which are not <br />finished and regarding landscaping that was removed from the <br />right-of-way, and Mr. Scheidt stated that he was glad to <br />have an opportunity to speak to the Board since Bain <br />Underground has been in the newspapers a bit, and there are <br />quite a few items that have caused delays which he does not <br />feel are their responsibility. It was his belief that the <br />project has been delayed 120 days or more not due to the <br />fault of himself or his company. <br />In further discussion, it was noted that the Board has <br />indicated that their main interest is to get the project <br />completed, and it was generally felt there needs to be <br />better communication between those involved in this project <br />in order for this to be accomplished. <br />Commissioner Lyons suggested that since we are not in a <br />position this afternoon to listen to the pros and cons of <br />this situation, that the Administrator hold a meeting <br />between the engineers, the Utility Department and Bain <br />Underground, and come back to us with a consolidated story <br />when Mr. Scheidt can be present. <br />Administrator Wright informed the Board that he can <br />meet with Engineer John Robbins and Mr. Scheidt at 10 <br />o'clock tomorrow morning. <br />78 <br />M, <br />
The URL can be used to link to this page
Your browser does not support the video tag.