My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/6/1982
CBCC
>
Meetings
>
1980's
>
1982
>
10/6/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:40 AM
Creation date
6/11/2015 2:33:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/06/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,@,her$wj6lcic, for additions to this Project, or for comple- <br />tion of this Project by others provided the Architect is not <br />in default under this Agreement, except by agreement in <br />writing and with appropriate compensation to the Archi- <br />tect. <br />'8.2 Submission or distribution to meet official regulatory <br />requirements or for other purposes in connection with the <br />Project is not to be construed as publication in derogation <br />of the Architect's rights. <br />ARTICLE 9 <br />ARBITRATION <br />between the PaA-116 la this AS;eemeat, atising 0119 04 Or - <br />l• _Ferenee .a_•- A_S and sig -_d <br />6e made Willi* a FeeseRable tifne aftef the elMm di ._ <br />ARTICLE 10 <br />TERMINATION OF AGREEMENT <br />10.1 This Agreement may be terminated by either party <br />upon seven days' written notice should the other party <br />fail substantially to perform in accordance with its terms <br />through no fault of the party initiating the termination. <br />10.2 This Agreement may be terminated by the Owner <br />upon at least seven days' written notice to the Architect <br />in the event that the Project is permanently abandoned. <br />10.3 In the event of termination not the fault of the Ar- <br />chitect, the Architect shall be compensated for all services <br />performed to termination date, together with Reimburs- <br />able Expenses then due. <br />8"Ph 40.4 <br />F. <br />W M UN F F. T I �"" W M9 <br />ARTICLE 11 <br />MISCELLANEOUS PROVISIONS <br />11.1 Unless otherwise specified, this Agreement shall be <br />governed by the law of the principal place of business of <br />the Architect. <br />11.2 Terms in this Agreement shall have the same mean- <br />ing as those in AIA Document A201, General Conditions <br />of the Contract for Construction, current as of the date <br />of this Agreement. <br />11.3 As between the parties to this Agreement: as to all <br />acts or failures to act by either party to this Agreement, <br />any applicable statute of limitations shall commence to <br />run and any alleged cause of action shall be deemed to <br />have accrued in any and all events not tater than the rele- <br />vant Date of Substantial Completion of the Work, and as <br />to any acts or failures to act occurring after the relevant <br />Date of Substantial Completion, not later than the date of <br />issuance of the final Certificate for Payment. <br />11.4 The Owner and the Architect waive all rights <br />against each other and against the contractors, consult- <br />ants, agents and employees of the other for damages cov- <br />ered by any property insurance during construction as set <br />forth in the edition of AIA Document A201, General Con- <br />ditions, current as of the date of this Agreement. The <br />Owner and the Architect each shall require appropriate <br />similar waivers from their contractors, consultants and <br />agents. <br />ARTICLE 12 <br />SUCCESSORS AND ASSIGNS <br />12.1 The Owner and the Architect, respectively, bind <br />themselves, their partners, successors, assigns and legal <br />representatives to the other party to this Agreement and <br />to the partners, successors, assigns and legal representa- <br />tives of such other party with respect to all covenants of <br />this Agreement, Neither the Owner nor the Architect shall <br />assign, sublet or transfer any interest in this Agreement <br />without the written consent of the other. <br />ARTICLE 13 <br />EXTENT OF AGREEMENT <br />13.1 This Agreement represents the entire and integrated <br />agreement between the Owner and the Architect and <br />supersedes all prior negotiations, representations or agree- <br />ments, either written or oral. This Agreement may be <br />amended only by written instrument signed by both <br />Owner and Architect. <br />AIA DOCUMENT 8141 • OWNER -ARCHITECT AGREWEN1 • 1r+IR1EENUI EOI11ON • JULY 19.1 • AIAO • 01977 <br />8 8141-19" THE AMERICAN INSTItUTE UF ARCHJTECTS, 17JS NEW YORK AVENUE, N.W., WASHINGtON, O.C. 20004 <br />51 PA -53 2 <br />O C i s 01^82, . <br />
The URL can be used to link to this page
Your browser does not support the video tag.