My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/3/1982
CBCC
>
Meetings
>
1980's
>
1982
>
11/3/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:40 AM
Creation date
6/4/2015 11:07:12 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/03/1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV3 1982 s . <br />51 <br />SECTION XIX <br />Should the Corporation desire to establish rates and <br />Charges or should the Corporation desire to increase any charges <br />'heretofore established and approved by the Board, then the <br />Corporation shall notify the Board in writing, setting forth the <br />schedule of rates and charges which it proposes. A public <br />i <br />hearing shall then be held on such request, of which notice <br />shall be given by publication in a newspaper regularly published <br />in said County at least one time, not more than one month or <br />less than one week preceding such hearing. Certified proof of <br />publication of such notice shall be filed with the Board, Said <br />hearing may thereafter be continued for a reasonable time as <br />determined by the Board. If the Board enters an order pursuant <br />to such hearing and the Corporation feels aggrieved by such <br />order the Corporation may seek review of the Board's action by <br />filing a petition for Writ of Certiorari in the Circuit Court of <br />the County. The Board shall act on the rate request within <br />ninety (90) days. <br />SECTON XX <br />Prior to the Corporation placing any of its facilities <br />in any of the public places as herein authorized, the <br />Corporation shall make application to and obtain any required <br />permits from the County authorizing said construction in the <br />same manner as permits are authorized in the County for the use <br />of -the public roads as shall now or hereafter be established by <br />regu,.ations of the County. The County shall have the right when <br />r <br />special circumstances exist to determine the time during which <br />such construction shall be done. <br />SECTION XXI <br />If the Corporation fails or refuses to timely and <br />faithfully keep, perform and abide by each and all of the terms <br />and conditions of this franchise, then the Board shall give the <br />Corporation written notice of such deficiencies or defaults and <br />a reasonable time within which the Corporation shall remedy the <br />-17- <br />0 <br />W <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.