My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/3/1982
CBCC
>
Meetings
>
1980's
>
1982
>
11/3/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:40 AM
Creation date
6/4/2015 11:07:12 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/03/1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r N 0 V 3 1982 51 <br />2 <br />for approximately $10,000. Funding can be considered at a <br />later date'after permits are obtained, probably from Road and <br />Bridge Division currently budgeted funds such as the Road and <br />Bridge Materials account. <br />Alternative No. 2 <br />Attempt to stabilize the shoreline with clean concrete <br />and other construction material as it .becomes available. This <br />method may be pursued with the DER, but plant species such <br />as mangrove•dd not thrive as well as with the Armorflex type <br />protection. The material also tends to shift and does not <br />provide a uniform, homogenious protection. <br />RECOMMENDATIONS AND FUNDING <br />It is recommended by the Scenic Trails Committee and Public <br />Works Director that the Engineering Department be authorized= <br />to seek permits from the Regulatory Agencies for installing <br />a 200 lineal foot test section of Armorflex (precast concrete <br />erosion control product). At the same time,: =the Engineering <br />Department be authorized to apply for permits to place clean <br />fill (Rip Rap) along the River Bend area. There is no funding <br />to be considered at this time except for permit application <br />fees. Funding to be from budgeted'Engineering and Road and <br />Bridge Department funds. <br />Mr. Davis emphasized that they are not requesting <br />funding:at this time, but they just wish permission to get <br />the dredge and fill permits, which takes quite a while. <br />Richard Van Slyke of Florida Land Company requested <br />that the Board table this matter. He explained that Florida <br />Land did not know this was on the agenda and would like <br />their engineering staff to look through the material; they <br />feel the alternatives recommended are not really acceptable <br />a,iternatives for several reasons. <br />MOTION WAS MADE by Commissioner Lyons, <br />SECONDED by Commissioner Bird, to table <br />discussion of stabilization of the shore- <br />line along Jungle Trail until the next <br />meeting. <br />1= <br />
The URL can be used to link to this page
Your browser does not support the video tag.