Laserfiche WebLink
N 0 V 17 R19q?or <br />November 16, 1982 <br />Page 10 <br />III. TRANSPORTATION IMPACTS <br />Road Facilities: <br />BOOK F:,eF�: <br />The proposed rezoning to R-1MP, Mobile Home Park District, in <br />conjunction with the mobile home density policy (6 units/acre) <br />established in the Comprehensive Plan and existing constraints <br />to the land, would allow for a maximum of 720 units to be placed <br />on the site. This level of development would generate an addi- <br />tional 4000 Average Daily Trips (ADT's) and an additional <br />430 Peak Hour Trips. ThA ex3.sting capacity of State Road 60 <br />located near the subject property is 10,000 Average Daily Trips <br />west of I-95 and 22,000 Average Daily Trips east of I-95. The <br />traffic impact of the proposed rezoning would create a volume <br />capacity ratio of .61 west of I-95 (610 of capacity) and .57 <br />east of I-95 (57% of capacity). This analysis is based on a <br />100% eastern directional split with the assumption that all <br />users will travel to shopping, medical, and recreational facil- <br />ities located in Vero Beach. At the stated level of capacities, <br />the proposed rezoning would not adversely impact the existing <br />road network. <br />Airport Facilities: <br />The subject property lies beneath the downwind leg for landing <br />on Runway 18 at the New Hibiscus Airport. The.$ureau of Aviation, <br />Department of Transportation, has determined that the property <br />is not located in an accident potential -hazard area. <br />utilizes a standard left turn flight The airport <br />ends <br />the subject property. However, the estimated waverage tdecibele <br />level for noise impacts from the airport is not significant. <br />IV. UTILITIES <br />Existing Facilities: <br />Electric power is presently available to the subject property <br />from Florida Ppwer and Light Company. <br />There are presently no centralized sewer and water systems avail- <br />able to serve the subject property. Two private utility <br />franchises exist in relAtion to Village Green and Heritae <br />Village Mobile Home Parks. g <br />The nearest of these two franchises, Village Green, is located <br />approximately one-half mile east of the subject property. There <br />are presently no plans to expand this system to include the <br />subject property as a portion of its service area; thus, any <br />immediate development of the subject property would require in-, <br />dividual septic systems and wells or private sewer and water <br />treatment systems. <br />County ServiceArea Plan <br />The Utility Element of the Comprehensive Plan states in reference <br />to sewer and water service for the State Road 60 Corridor, "There <br />is pressure for expansion along the major east -west thoroughfare <br />...In the future, the County will provide service to this area <br />as part of its customer base. This area will be a future point - <br />for interconnecting the North and South County systems." <br />The Plan recognizes that the MD -1 District and the I-95 Commercial/ <br />Industrial Node, being part of the State Road 60 Corridor, are <br />especially vulnerable to rapid urbanization over the next several <br />years._ As a result, the Plan specifies a mid-term utilities <br />service priority planned for the area by the Year 1990. <br />This priority includes the subject property. As outlined in <br />the Land Use Section of the analysis, the subject property is <br />highly compatible for industrial use. Through the future provision <br />of central water and sewer services, industrial development of <br />the I-95 Commercial/Industrial Node, which should include the <br />subject Property, will be facilitated. <br />